GABLE FASCIA
x20
2" (5,1 cm)
2
Position 3-1/4 x 5-7/8"
SHIM
(Fig. A)
.
Secure using one 2" fi nish nail fl ush to side fascia and soffi t, as shown.
Repeat to install shim on opposite side.
Position fascia with primed side out, fl ush at peak and to roof panels as shown
(Fig. B, Fig C)
.
Secure using 2" fi nish nails spaced evenly as shown.
Repeat STEP 2 to attach fascia board on the front side.
(Front side is without 3-1/4 x 5-7/8" shim.)
3
You have installed your back gable fascia.
FINISH
1
BEGIN
PARTS REQUIRED:
x2
3/8 x 4-3/4 x 75-7/8" (1 x 12,1 x 192,7 cm)
x2
3/8 x 4-3/4 x 75-7/8" (1 x 12,1 x 192,7 cm)
Primed Side Out
Fig. C
Flush at peak.
Flush with top of OSB roof panels
Fig.B
Flush
2" (5,1 cm) Finish Nails
x8 per side
Painted
Red
Painted
Green
x2
3/8 x 3-1/4 x 5-7/8" (1,0 x 8,3 x 14,9 cm)
SHIM
Fig. A
2" (5,1 cm)
Finish Nail
x2 per side
Flush
SHIM
SPACED EVENL