27
2" (5,1 cm)
PARTS REQUIRED (TEMPORARY):
2 x 4 x 94-1/2" (5,1 x 10,2 x 240 cm)
x1
3" (7,6 cm)
UN
First, nail lower edge of panel to floor frame using 2" nails 6" apart.
Angle nail to hit floor frame
(Fig. A)
.
3
You have finished standing your right side wall.
FINISH
5
Secure side wall bottom plates to floor using 3" nails
(Fig. A)
.
4
3" (7,6 cm)
x12
x2
x25
RIGHT SIDE WALL INSTALLATION
3" (7,6 cm)
Screws
UN
3" Nails into bottom plate.
DOOR
DOOR
Panel
Flush
3" (7,6 cm)
Screw
BEGIN
Stand right sidewall on floor.
It is important to secure the right sidewall in the following order.
ENSURE 20-5/8" MEASUREMENT IS TOWARD BACK OF SHED
Center right sidewall assembly on the 140-5/8" (357,2 cm) floor dimension.
Use
UN
as a temporary brace. Secure with two 3" screws.
2
1
140
-5/8
"
(357
,2 c
m)
20-5/8"
(52,4 cm)
Nail 2" nails first.
2" (5,1 cm)
Nails
3" (7,6 cm)
Nails
Fig. A