56
x228
Flush at
peak.
Flush at peak.
Fig. G
Fig. F
Keep spacing between the center of the
rafters at the lower edge of the panel
and secure with one 2" nail into each
rafter
(Fig. E)
.
Move to the top of the panel and keep
spacing between the center of the
rafters. Secure with one 2" nail into
each rafter
(Fig. E)
.
Nail the roof panel using 2" nails 6" apart
on edges and 12" apart inside panel.
Attach the second
47-7/8 x 48"
upper roof panel flush to first panel and
peak
(Fig. F, G)
.
3
At back end attach
22 x 46-1/2
"
roof panel flush
to back gable trim and large roof panel
(Fig. H)
Nail the roof panel using 2" nails 6" apart
on
edges and 12" apart inside panel.
Attach
22 x 96"
roof panel flush to the installed
panel
(Fig. I)
and front rafter.
Nail the roof panel using 2" nails 6" apart
on
edges and 12" apart inside panel.
Attach
8-7/8 x 70"
roof panel flush to the front
overhang trim and peak
(Fig. J)
.
Nail the roof panel using 2" nails 6" apart.
Repeat process to attach roof panels
on the opposite side.
You have finished installing
your roof panels.
4
5
6
7
PARTS REQUIRED:
ROOF PANELS
12"
(30,5 cm)
12"
(30,5 cm)
48"
(121,9 cm)
6"
(15,2 cm)
6"
(15,2 cm)
Fig. E
24"
(61 cm)
22-1/2"
(57,2 cm)
24"
(61 cm)
24"
(61 cm)
24"
(61 cm)
23-7/8"
(60,6 cm)
NOTE:
Measurement from outside of trim.
2" Nail
Fig. H
Fig. J
Gable
Trim
3/4"
(1,9 cm)
3/4"
(1,9 cm)
Fig. I
7/16 x 47-7/8 x 48"
(1,1 x 121,6 x 121,9 cm)
Flush
FINISH
8
2" (5,1 cm)
Flush
Flush
to trim
Flush
Flush
70"
(177,8 cm)