Flush
SHINGLES - RIDGE CAP
s
You will finish off the top of the roof with a ridge cap made from shingles.
Note:
.
s
e
c
e
i
p
t
u
c
2
2
-
0
2
t
u
o
b
a
d
e
e
n
ll
i
w
u
o
Y
s
Cut shingles into THREE pieces.
Hint:
Use cut-off pieces first.
Score shingle,
then snap-off angled cut.
Install first ridge cap flush to shingles at front, as shown.
Install second ridge cap 5" back, as shown.
2
3
BEGIN
1
2"
(5 cm)
2"
(5 cm)
2"
(5 cm)
2"
(5 cm)
2"
(5 cm)
2"
(5 cm)
Top of slot.
Weather Seal
(1) Nail per side through weather seal.
5"
12,7 cm
FRONT OF
SHED
FRONT OF
SHED
Flush
20 to 22
Pieces
(1) Nail per side through weather seal.
52
Summary of Contents for STOCKTON 8' x 12'
Page 2: ...This page intentionally left blank...
Page 11: ......
Page 13: ......
Page 14: ...12...
Page 16: ...14...
Page 17: ......
Page 18: ...16...
Page 19: ......
Page 20: ...18...
Page 21: ......
Page 22: ...20...
Page 23: ......
Page 24: ...22...
Page 25: ......
Page 26: ...24...
Page 27: ......
Page 28: ...26...
Page 29: ......
Page 30: ...28...
Page 31: ......
Page 32: ...30...
Page 33: ......
Page 34: ...32...
Page 35: ......
Page 36: ...34...
Page 37: ......
Page 38: ...36...
Page 39: ......
Page 40: ...38...
Page 41: ......
Page 42: ...40...
Page 43: ...41...
Page 44: ...42...
Page 45: ......
Page 46: ...44...
Page 47: ......
Page 48: ...46...
Page 49: ......