Connection method
4.1.2 Power supply module
4-6
4.1.2 Power supply module
Power supply backup module (UPS module 10)
4.1.3 I/O module
Machine control panel I/O (PP72/48)
o.k
Bat
Alarm
+160s
+80s
+40s
+20s
+10s
5s
max
t
On / Off
Bat
U
L+
U
15A
6EP1931-2EC01
1 2 3 4 5
DC-USV-Modul 10
n.c.
Bat
o.k
Alarm
X2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9
In
L+
M
Out
L+
M
+Bat
-Bat
X1.1
X1.2
X1.3
X1.4
X1.5
X1.6
t
タイマ設定
24V電源入力
24V電源出力
バッテリモジュール
電源切入シーケンス
用信号
Timer setting
24 V power supply input
24 V power supply output
Battery module
Signals for power
supply on/off sequence
PROFIBUS-DP
connector
OVERTEMP
POWER
RESET
S1
EXCHANGE
READY
X222
X2
X1
X111
X333
24 VDC input
connector
I/O connector 3
I/O connector 2
I/O connector 1
PROFIBUS-DP address
setting switch
Summary of Contents for CNC Series
Page 1: ...Maintenance Manual Serviceman Handbook MANUAL No NCSIE SP02 19 Yaskawa Siemens CNC Series...
Page 26: ...Part 1 Hardware...
Page 38: ...System Configuration 1 2 3 Spindle motor designations 1 12...
Page 58: ...Installing the control panels 2 3 5 Installing lightning surge absorbers 2 20...
Page 62: ...Installing the motors 3 4...
Page 84: ...Connection method 4 3 2 Setting the rotary switches on the inverters and servo units 4 22...
Page 96: ...Part 2 Software...
Page 102: ...Software configuration 6 6...
Page 113: ...7 2 Network settings 7 11 8 Click on the radio button to the left of Specify an IP address...
Page 121: ...7 2 Network settings 7 19...
Page 122: ...Part 3 PLC...
Page 154: ...Part 4 Setting up and maintenance...
Page 160: ...Overview of System 10 1 2 Basic operation 10 6...
Page 204: ...How to use Digital Operation 12 2 9 Setting the password setting for write prohibit 12 32...
Page 327: ...Error and Troubleshooting 15 4...
Page 328: ...15 1 Errors without Alarm Display and Troubleshooting 15 5...
Page 329: ...Error and Troubleshooting 15 6...
Page 343: ...Maintenance and Check 16 3 3 Setting up Initializing Absolute encoder 16 14...