7.
Click [Make].
ð
All the necessary files are copied and the registry is accord-
ingly adjusted.
The progress is displayed in a new window.
8.
Please wait a moment.
ð
After successful execution the following completion screen
appears.
9.
Confirm this window with [OK], remove the SD card and re-start
the panel.
ð
The panel should start with the Startup-Manager after the
restart.
4.5 Connection to a PLC system
For the inclusion into your PLC system several HMI/SCADA project-
engineering platforms are at your disposal that has to be installed at
an external PC. Here you may create your project, where appropriate
simulate it and transfer it to the Touch Panel via a connection that
you’ve entered before. Via the at the Touch Panel pre-installed run-
time version of the HMI/SCADA project engineering platforms your
project is run able.
Overview
VIPA HMI
Deployment under Windows CE 6.0 Prof.
Connection to a PLC system
HB160 | TP-ECO | 62H-MGC0 | GB | 16-02
53