9
Maintenance and Inspection
9.4 Gas Maintenance Procedure in the Gas Balancer
9-22
167109-1CD
HW1482308
MS165
14. Release the blowdown valve of the gas filling device and regulator,
and then discharge the gas in the hose.
15. Disconnect the gas filling device from the nitrogen gas cylinder.
16. Turn ON the power supply of the DX200.
Fig. 9-13: Gas Injecting Operation
Cover
㸦
HW1405134-1
㸧
㸧
㸦
Surface temperature measuring point
Gas inlet/gas exhaust port
Enlarged figure
A part
Measure on the surface
of the gas balancer
after removing the cover.
Conical spring washer 2L-4 (2 washers)
Hexagon socket head cap screw M4 (length: 6 mm)(2 screws)
A part
Hexagon socket head screw plug M6
with flange
83 of 100