4.17 Job in Master Task
4-40
8
Register a PSTART instruc-
tion.
Register PSTART instructions to start the subtask 1 and 2.
Since the first PSTART instruction is for starting the follower sub-
task, add a tag SYNC and the leader subtask.
Then, register a PSTART instruction to start the leader subtask.
• If a tag SYNC is added to neither of PSTARTs, an alarm occurs.
• If the synchronous task is set to “UNUSED,” the follower task, if it is SUB1, performs the
same motion as the leader task SUB2, and if it is SUB2, performs the same motion as the
leader task SUB1.
Operation
Explanation
0000
0001
0002
0003
0004
0005
0006
JOB CONTENT: MASTER
JOB NAME: M-TASK
CONTROL GROUP: NON GROUP
STEP NO: 000
TOOL:
EDIT
DISPLAY
UTILITY
JOB
Short Cut
Main Menu
NOTE
104/210