2-18
166006-1CD
166006-1CD
2
Installation
2.5 Installation of Safeguarding
RM2-755/1255SL
Positioner
2.5 Installation of Safeguarding
To insure safety, be sure to install safeguarding. It prevents unforeseen
accidents with personnel and damage to equipment. The following is
quoted for information and guidance.
Positioner homing procedure and Manipulator to Positioner calibration can
now be performed.
2.5.1 Responsibility for Safeguarding (ISO10218)
The user of a robot system ensures that safeguards are provided and
used in accordance with Sections 6, 7, and 8 of this standard. The means
and degree of safeguarding, including any redundancies, shall correspond
directly to the type and level of hazard presented by the robot system
consistent with the robot application. Safeguarding may include but not be
limited to safeguarding devices, barriers, interlock barriers, perimeter
guarding, awareness barriers, and awareness signals.
WARNING
• Install all safeguarding.
Failure to observe this warning may result in injury or damage.
• Install the Positioner in a location where the Positioner with a jig
does not hit against anything such as the wall or the safeguarding.
Failure to observe this warning may result in injury or damage.
• Do not start operating the Positioner or turn ON the power before it
is firmly anchored.
The Positioner may overturn and cause injury or damage.
CAUTION
• The Positioner system should be installed by qualified personnel
who are familiar with the installation and setup of a robotic system.
Failure to observe this caution may cause injury or damage.
• Do not install or operate a Positioner that is damaged or lacks parts.
Failure to observe this caution may cause injury or damage.
• Before turning ON power, check that all shipping bolts and brackets
are removed.
Failure to observe this caution may cause in damage to the major
driving parts.
41 of 145