2-11
183523-1CD
183523-1CD
2
Installation
2.3 Positioner Installation
RM2-755-RDR Postioner
2.3.4.1 Setting Headstock
1. Place leveling bolt plates under each M20 leveling bolts so that the
bolts do not rest on the concrete.
• There should be approximately 6.35mm between the top of the
leveling bolt plate and the underside of the headstock. See
as a reference only.
Fig. 2
-
6: Headstock Installation on Floor.
2. Place a machinists' level on the front of the machined surface of the
Headstock (without the overhead rail attachment if supplied).
3. Adjust the leveling bolts so the top of the headstock frame is level in
both the “X” and “Y” direction within 0.5°.
• It is best to use three leveling bolts with the fourth leveling bolt
retracted to adjust the level.
NOTICE
This elevation is just a starting point, and is not a final requirement.
6.35 mm
M20 LEVELING BOLT
LEVELING
BOLT PLATE
x-axis
y-axis
Machined
Surface
31 of 104