9.5 Commissioning and Initialization
1.
Install your System 300S with your CPU.
2.
Wire the system by connecting cables for voltage supply and signals
3.
Connect your PROFINET IO controller with Ethernet.
4.
Switch on the power supply.
ð
After a short boot time, the CP is in idle.
At the first commissioning respectively after an overall reset of the CPU, the
PROFINET IO controller and the Ethernet PG/OP channel have no IP address.
This function is supported only if the PROFINET IO controller is not yet configured. You
get valid IP address parameters from your system administrator. The assignment of the
IP address data happens online in the Siemens SIMATIC Manager starting with version V
5.3 & SP3 with the following proceeding:
1.
Start the Siemens SIMATIC Manager.
2.
Switch to "TCP/IP -> Network card .... " using
‘Options
è
Set PG/PC interface
è
’
.
3.
Open the dialog for initialization of a station with
‘PLC
è
Edit Ethernet node’
.
4.
To get the stations and their MAC address, use the [Browse] button or type in the
MAC address. The Mac address may be found at the front of the CPU.
5.
Choose if necessary the known MAC address of the list of found stations. To check
this with [Blink] you may cause the MT LED to blink.
6.
Either type in the IP configuration like IP address, subnet mask and gateway. Or
your station is automatically provided with IP parameters by means of a DHCP
server. Depending of the chosen option the DHCP server is to be supplied with
MAC address, equipment name or client ID. The client ID is a numerical order of
max. 63 characters. The following characters are allowed: Hyphen "-", 0-9, a-z, A-Z
7.
Confirm with [Assign IP configuration].
Directly after the assignment the PROFINET IO controller is online reachable using the
set IP address data.
Since the IP address data, which were assigned here, are deleted at
PowerOFF, you have to take them to a project by means of the hardware
configuration, which is described next.
Initialization of the Ethernet PG/OP channel
Assembly and commis-
sioning
Assign IP address param-
eters
System 300S
+
Deployment Ethernet communication - PROFINET
Commissioning and Initialization
HB140 | CPU | 315-4PN23 | en | 18-02
126