Transportation
3
-
17
3.2
Shipping brackets and bolts
NOTICE
Before turning ON the power, check to be sure that the shipping bolts and brackets are
removed.
After removing the transport securing devices and the shipping bolts, keep them at a safe
place. The transport securing devices and shipping bolts will be required again if the system
is transported again.
The robot is equipped with transport securing devices and shipping bolts to reduce external
forces to a minimum during transport.
•
The shipping brackets and bolts are painted yellow.
•
The shipping bracket will be fastened by 2 screws M12.
3.3
Damping material during transportation
To protect the robots machinery from external forces during transportation, shipping
brackets are installed (Refer to figure below).
NOTICE
Before turning ON the power, check to be sure that the rubber buffer are removed.
After removing the rubber pads, keep them at a safe place. The rubber pads will be required
again if the system is transported again.
For transportation purposes the robot is fitted in the range
and
with a rubber
buffer (see ).
Fig. 3-1: Damping material for transport
Shipping brackets and bolts
2 screws M12 x 30, 2 spring
washers M12 and 2 washers
M12
Shipping brackets
1
2
A
B
Summary of Contents for YYR-1-06VXH25-A10
Page 1: ...ROBOTICS YYR 1 06VXH25 A10 GP25 12 Standard Operating and Maintenance Manual...
Page 51: ...Maintenance and inspection 9 51 Fig 9 2 Inspection intervals...
Page 56: ...Maintenance and inspection 9 56 9 3 Wrist unit Sealing part U arm Cover Gasket U arm 1 2 3...
Page 77: ...Parts lists 11 77...