22.
23.
assembly
assembly
Fit the bearing retainer clips in the groove
between the drive side integrated axle and the
eccentric housing of the front triangle. Use
a 2.5mm allen key to secure each clip with a
m4x8mm flat head bolt prepped with blue loctite.
torque to 15-20 in/lb.
lightly grease the threads on the stop bolt and
tighten into the eccentric housing with a 6mm
allen key. ensure the main pivot axle hole is
turned to 3 o’clock during this step
torque to 40-45 in/lb.
slide the upper link over the lower pivot axle hole
on the front triangle. ensure the yeti logo faces
the front of the frame.
Grease the lower link axle and install it through
the link from the drive side of the frame. Use a
dead blow hammer to tap the axle into place.
05.
06.
08.
07.
apply blue loctite to the threads on the lower link
axle cap. install and tighten the cap into the lower
link axle with a 5mm and 6mm allen key.
torque to 90-95 in/lb.
Create two collet bolt assemblies. place a collet
wedge over each collet bolt and secure the
wedge with a retaining ring using a pair of lock
ring pliers. prep the outside of each wedge and
the bolt threads with grease.
slide the rear triangle over the integrated axles
and align it with the collet pin axle hole.
Grease the shaft and threads of the main pivot
collet axle. insert the collet axle through the
swingarm and integrated axles from the non drive
side of the frame and tighten with a 10mm allen
key.
torque to 35-40 in/lb.
09.
10.
11.
12.