background image

 

Unit 1 Westfield Court | Barns Ground | Clevedon | Bristol | BS21 6FQ | UK 

Tel No: +44 1275 217060 | Email: support@yetitool.com 

 

SMARTBENCH V1.1 

9

 

Fit the Z Head 

 

 

To Fit the Z Head, offer up the Z head ensuring 

the extraction elbow is facing towards you. 

Load the Z head by inserting the wheels into 
the channels until the Z head holds onto the 

beam. This should be just passed the first 

wheel. 

 

Place the drag chain latch plate over the 

protruding face on the side of the Z Head 

bottom plate ensuring the signal cable seats 

into the recess. 

 

Secure this in place with the thrubmscrew 

provided. 

 

 

 

Plug in the signal cable and secrure with the 

thumbscrew. 

Place the drag chain latch plate over the 

protruding face on the side of the Z Head. 

Summary of Contents for SMARTBENCH V1.1

Page 1: ...Quick Start Guide...

Page 2: ...ity with the essential requirements and other relevant requirements of EU Directive 2006 42 EC MD EU Directive 2014 53 EU RED and EU Directive 2011 65 EU RoHS2 Type Essential Requirements Health Safet...

Page 3: ...signature for and on behalf of Yeti Tool Limited Ed Sells Director IMPORTANT This is a class 1 machine It s power supply MUST be earthed Only use the power cable supplied If you require a replacement...

Page 4: ...you get on we are always keen to receive feedback and follow what SmartBench creates What s in the box Start by getting familiar with SmartBench s key components Check the contents If any of the abov...

Page 5: ...round Clevedon Bristol BS21 6FQ UK Tel No 44 1275 217060 Email support yetitool com SMARTBENCH V1 1 4 Key components Figure 1 Y Bench Figure 2 Z Head Figure 3 Leg Set x2 Figure 4 Console Figure 5 X Be...

Page 6: ...End Identify the home end of the Y Bench Figure 1 page 4 by looking for the Home Icon At the opposite end of the bench fit Leg Set 1 by first unfolding the legs Lift the Y Bench to accept the locatio...

Page 7: ...Use the leg set to support the Y bench This should be just past the first crossbeam To fit the X Beam Lower offer up the beam ensuring the home labels are aligned Ensuring the wheels are aligned with...

Page 8: ...Lift the Y Bench by the end plate and take Leg set 2 with the other hand Lift the Y Bench to accept the location pins of the Leg Set Slide the leg clamp pins into the slots in the Y Bench end plate P...

Page 9: ...the X Beam Upper onto the lower X Beam Lower as shown above The forks on the end of the X Beam Upper should slide on the skids of the X Beam Lower with very little force Secure in place by tightening...

Page 10: ...ing the wheels into the channels until the Z head holds onto the beam This should be just passed the first wheel Place the drag chain latch plate over the protruding face on the side of the Z Head bot...

Page 11: ...ided Plug in the power cable and secrure with the thumbscrew You can now push the Z head onto the X Beam Upper until all wheels are engaged Fit the dust shoe plug into the front of the dust shoe Fit t...

Page 12: ...to the connector and rotate the cuff clockwise to secure Fit the Extractor SmartBench has a dedicated power outlet for extractors to enable auto extraction but the extractor must not draw more than 10...

Page 13: ...not exceed the power rating plug in your extractor to SmartBench s extractor power outlet Attach the extraction hose to the Z head by inserting the connector into the elbow and rotating cloockwise Fi...

Page 14: ...V1 1 13 Check cable connections Check that all cables are connected correctly 1 Z Head Signal 2 Z Head Power 3 X Beam 4 Extraction power if using the auto extraction system 5 Console 6 Mains Power Fig...

Page 15: ...17060 Email support yetitool com SMARTBENCH V1 1 14 Turning on SmartBench Assuming the above instructions have been followed correctly SmartBench can now be powered on by releasing the Emergency stop...

Page 16: ...portant Leave location set as GB 2 Insert your Network name Touch on the network name box Clear the text Network name using the on the pop up keyboard Once the Network name box is empty add your WiFi...

Page 17: ...1 1 16 Press the connect button Please note the system will then automatically reboot The console screen will go black as the console restarts this is normal If you have problem connecting to Wi Fi pl...

Page 18: ...pdates Additional functionality to improve our customers user experience Cutting apps from Q1 2020 Virtual jig from Q3 2020 You ll find the software update button in the Settings Developer screen Pres...

Page 19: ...stol BS21 6FQ UK Tel No 44 1275 217060 Email support yetitool com SMARTBENCH V1 1 18 Home SmartBench From the Lobby screen press to go to CAD CAM operation Press the home button The home button will a...

Page 20: ...FQ UK Tel No 44 1275 217060 Email support yetitool com SMARTBENCH V1 1 19 Step 12 Open a file Go to Job screen Press the file explorer Green Choose your file Accept your file choice Green For full det...

Page 21: ...SMARTBENCH V1 1 20 Set X Y datum start point for the job The X Y datum refers to the point at which the job will start This is set by moving the cutter to the intended point and telling EasyCut when y...

Page 22: ...support yetitool com SMARTBENCH V1 1 21 Now check that your job location fits within SmartBench s bounds Go to Map screen Make sure the X Y Datum is in the right position and your job does not reach...

Page 23: ...et Z datum start point for the job Once the X Y datum is defined the tip of the router cutter needs to be registered relative to the material This is referred to as setting the Z datum and should be d...

Page 24: ...e plate directly below the cutter tip Make sure the back of the probe plate lies flat on the surface you are trying to probe The probe plate should be silver side up If the tip of the cutter isn t clo...

Page 25: ...4 1275 217060 Email support yetitool com SMARTBENCH V1 1 24 Run job To run your job press the play button Confirm you wish to run your file by pressing the GO button For more details on EasyCut please...

Page 26: ...which includes a grey speed control cable as well as the power cable You can ignore references to this wire if you have the Standard version of SmartBench In order to change the spindle you will want...

Page 27: ...and grey wire Disconnect the power cable by squeezing the clips together and pulling the cable upwards Remove the grey speed control cable from the recess and pull to remove from the connector Step 2...

Page 28: ...into the spindle cage bolt and rotate left to loosen the bolt Then lift your spindle out of the top of the cage The spindle may need to be rotated in order to remove it Step 3 Once you have changed y...

Page 29: ...port yetitool com SMARTBENCH V1 1 28 Step 4 Reconnect the speed control wire ensuring it is secured back into the recess Push the power cable back into the spindle Support If you require any support p...

Reviews: