53
Assembly Step 7:
Mount the mounting wedges used for vibration
damping on the vehicle roof to the drilled holes and
insulate with SIMSON ISR 70-03 white mastic.
Assembly Step 9:
Place the monoblock unit on the vehicle roof so that it coincides with the mounting
wedges and the cut places. In order to mount the condenser on the vehicle roof, fasten it
to the wedges with M10 nut in accordance with it. Mount the evaporator to the vehicle
roof with M10 bolts.
EN
Assembly Step 8:
Assemble the hose grommet to the hole drilled for the grommet
on the vehicle roof and insulate it with SIMSON ISR 70-03
white mastic.
SÜRÜŞ YÖNÜ
Summary of Contents for YS 50
Page 22: ...TR YS 50 DI N TES ST G R N S R Y N 16...
Page 24: ...18 YS 50 N TES ALT G R N S R Y N TR...
Page 38: ...YS 50 ST VE ALT N TES SON G R N S R Y N 32 S R Y N ST G R N ALT G R N TR...
Page 45: ......
Page 61: ...YS 50 OUTDOOR UNIT TOP VIEW 54 DRIVE DIRECTIO N EN...
Page 63: ...YS 50 INDOOR UNIT TOP VIEW DRIVE DIRECTIO N EN 56...
Page 84: ......
Page 85: ......
Page 86: ......
Page 87: ......