YG125-30B Maintenance Manual
Magneto and starting system
85
carefully take it out from the left side.
Installation is in the reverse order of removal
To mount the rotor assembly:
1.
Mount the disk gear washer, coat the mixture of
engine oil and molybdenum disulfide onto the left
crank journal, and mount the disk gear and confirm
the semicircular key.
2.
Mount the rotor assembly
3.
Mount the plain washer and apply thread retaining
adhesive LOCTITE648 to the fastening nut M12; use
the rotor fastening tool
to fasten the rotor,
and screw up the nut M12 to the torque of 45N.m
4.
To install the double-linked gear:
The Washer and the double-linked gear is assembled into
the left crankcase
5.
To install the left front cover:
⑴
Clean the sealing paper gasket remaining on the left
crankcase and left front cover, replace with new left front
cover sealing paper gasket and confirm the location pin,
starting idle gear, double-linked gear, etc. are in correct
position.
⑵
Mount the left front cover,
⑶
Mount the left front cover bolt
⑷
Connect the magneto leads.
⑸
Mount the left rear cover, gear shift pedal and engine
protection plate.
⑹
Put on the oil drain plug and refill engine lubricating oil.
Take it out from the left
Motor connecting bolt
Torque
Rotor fastening to
ol
Apply the mixture of engine oil and
molybdenum disulfide
Double-linked gear
Left front cover
Check for shaft bending
Edge ruler
Play inspection
Summary of Contents for YG125-30B
Page 99: ...YG125 30B Maintenance Manual Frame and exhaust system 106 10 Frame and exhaust system...
Page 130: ...YG125 30B Maintenance Manual Illumination signal system 136 Circuit schematic drawing...
Page 141: ...YG125 30B Maintenance Manual Engine management system 147 Circuit schematic drawing...
Page 151: ...YG125 30B Maintenance Manual Electrical System Diagram 157 19 Electrical System Diagram...