YG48Q-5A Maintenance ManualRemoval and installation of engine
47
Removal and installation of engine
Maintenance notice
Installation of engine
Removal of engine
Maintenance notice
It is only necessary to remove the engine from the frame when performing maintenance on the engine’s crankshaft,
balancing shaft, driving parts, etc. It is unnecessary to remove the engine from the frame when performing maintenance
on other parts of the engine.
Before removing the engine, park the motorcycle on level ground, and completely drain engine lubricating oil.
To maintain the heat engine parts including cylinder head, cylinder body, piston, etc., it is necessary to remove the
coverings, fuel tank, throttle body, air filter assembly, etc.
To remove the engine’s right crankcase cover for maintenance, it is necessary to remove the rear brake pedal
To remove the engine’s left front cover for maintenance, it is necessary to remove the gear shift pedal, left rear cover, etc.
Installation is in the reverse order of removal.
While reinstalling, all wirings shall be carried out in accordance with the wiring diagram, and replace the removed buckle
strip
Specification
Net weight of engine
20
±
1kg
Engine oil volume1L
Key torque values
Engine hanging bolt
M8: (20-30)N.m
M10: (30-40)N.m
Rear fork shaft
(
50-60
)
N.m
Summary of Contents for YG48Q-5A
Page 38: ...YG48Q 5AMaintenance ManualFuel system 41 4 Fuel system...
Page 92: ...YG48Q 5AMaintenance ManualFrame and exhaust system 105 10 Frame and exhaust system...
Page 123: ...YG48Q 5A Maintenance ManualIllumination signal system 136 Circuit schematic drawing...
Page 126: ...YG48Q 5A Maintenance ManualIllumination signal system 139...
Page 133: ...YG48Q 5A Maintenance ManualEngine management system 146 Major parts and components...
Page 134: ...YG48Q 5A Maintenance ManualEngine management system 147...
Page 144: ...YG48Q 5A Maintenance ManualElectrical System Diagram 157 19 Electrical System Diagram...