modify them in any way in order to secure an electrical connection.

Do not touch or handle PV modules with broken glass or separated frames, 
unless the modules are disconnected and you are wearing proper personal 
protective equipment. Avoid handling PV modules when they are wet unless 
cleaning the PV modules as directed in this manual. Never touch electrical 
connections that are wet without protecting yourself with insulated gloves.

Transport and Handling

Yingli Solar PV modules must be transported in the supplied packaging only, 
and kept in the packaging until they are ready to be installed. At time of receipt, 
please verify that the delivered product is in fact the product ordered. The 
product name, subname and serial number of each laminate are clearly marked 
on the outside of each packing box.

Protect pallets against movement and exposure to damage during transportation. 
Do

 

not exceed the maximum allowable height of pallets to be stacked, as 

indicated on the pallet packaging. Secure pallets from falling over. If pallets are 
stored temporarily outside please place a protective covering over the pallet to 
protect it from direct weathering and do not stack pallets.

Figure 2: Pallet of PV modules

At the installation site, take care to keep modules and their electrical contacts 
clean and dry before installation. If connector cables are left in damp conditions 
then the contacts may corrode. Any module with corroded contacts should not 
be used. Yingli Solar PV modules are heavy, and should be handled with care, 
so non-slip gloves are required when handling and installation. Please never 
use the junction box or cables as a grip. Do not exert mechanical stress on the 
cables. Never steps on PV modules or drop or place heavy objects on them. 
Be careful when placing PV modules on hard surfaces, and secure them from 
falling. Broken glass can result in personal injury. PV modules with broken glass 
cannot be repaired and must not be used. Broken or damaged PV modules must 
be handled carefully and disposed of properly.

For unpacking frameless PV modules from supplied packaging, firstly, remove 
the pallet lid after removing security straps, and then remove the carton, paper 
corner and foam rubber. Remove PV modules one at a time by sliding them up 
the channel in the package with both hands (see Figure 3). You may need to 
secure the remaining PV modules in the pallet packaging to prevent them from 
falling over.

 

 

Figure 3: Packaging structure of frameless PV modules

For unpacking framed PV modules ensure that the pallet stands firm and that it 
isn´t inclined in such a way that modules can slide out during 

the unpacking process (opening side shouldn´t face downwards). Cut the two 
longitudinal and the two inner transverse security straps. Carefully cut and 
remove the cardboard of one short side of the box including the corresponding 
part of the upper lid and the bottom lid (see Figure 4). Pay attention to not 
damage the modules during the cutting process. Thirdly cut the two inner 
security straps around the modules, remove the two paper corners and pull 
slowly out the modules one by one. You may need to secure the remaining PV 
modules in the pallet packaging to prevent them from falling over.

 

Figure 4: Cutting cardboard and pull out modules

Check PV modules for damage due to transportation before installation. Do not 
install damaged modules. Please contact the company you have purchased the 
Yingli Solar PV modules for information or complaints.

PV module surfaces are susceptible to damage that could affect the performance 
or safety of the module. Do not damage or scratch the PV module surfaces, and 
do not apply paint or adhesive to any of the surfaces, including the frame. For 
your safety, do not disassemble or modify the modules in any way. Doing so may 
degrade performance or cause irreparable damage and will void any applicable 
warranties.

If it is necessary to store PV modules prior to installation, the PV modules 
should remain inside the packaging and protected from exposure that could 
compromise the durability of the packaging. 

Fire

Yingli Solar PV modules have a class A fire resistance rating in accordance with 
the IEC 61730-2 certification, while the materials of modules for class A please 
refer to the test report and CDF document. When PV modules are mounted 
on the rooftops, the roof must have a fire resistant covering suitable for this 
application. PV modules are electrical generating devices that may affect the 
fire safety of a building. 

The use of improper installation methods and/or defective parts may result 
in the unexpected occurrence of an electrical arc during operation. In order to 
mitigate the risk of fire in this event, PV modules should not be installed near 
flammable liquids, gases or locations with hazardous materials.

In the event of a fire, PV modules may continue to produce a dangerous 
voltage, even if they have been disconnected from the inverter, partly or entirely 
destroyed, or the system wiring has been compromised or destroyed. In the 
event of fire, inform the fire crew about the particular hazards from the PV 
system, and stay away from all elements of the PV system during and after a fire 
until the necessary steps have been taken to make the PV system safe.

A P P L I C AT I O N   I N F O R M AT I O N

Application Restrictions

Yingli Solar PV modules must be mounted on appropriate  structures, positioned 
on buildings, the ground, or other places suitable for PV modules (e.g. carports, 
building facades or PV trackers). PV modules must not be mounted on moving 
vehicles of any kind. Yingli Solar PV modules must not be installed in locations 
where they could be submerged in water. 

Yingli Solar PV modules must not be sited in locations where aggressive 
substances, such as salt or salt-water, or any other type of corrosive agent, could 
affect the safety and/or performance of the PV modules.

Summary of Contents for YGE G/G 60CL/F Series

Page 1: ...trol Failure to comply with the requirements listed in this manual will invalidate the Limited Warranty for PV modules as provided by Yingli Solar at the time of sale to the direct customer Additional...

Page 2: ...e short side of the box including the corresponding part of the upper lid and the bottom lid see Figure 4 Pay attention to not damage the modules during the cutting process Thirdly cut the two inner s...

Page 3: ...party electronic devices connected to PV modules may lead to mismatching and must be installed according to the manufacturer s specified instructions Figure 6 Electrical diagrams of series and parall...

Page 4: ...or optimal performance Yingli Solar recommends that the negative pole of the PV array be connected to ground Equipment Grounding The frame of the PV module as well as any exposed non current carrying...

Page 5: ...in the mechanical mounting instructions of this installation manual The installation shall follow the instructions below If the installation method is different from this manual please contact Yingli...

Page 6: ...taller or other qualified person The purpose of the PV system inspection is to ensure that all system components are functioning properly At a minimum this inspection should confirm the following All...

Page 7: ...e glass surface to enhance power output and reduce dirt and dust buildup In order to avoid module damage do not clean PV modules with a power washer or pressure washer Do not use steam or corrosive ch...

Page 8: ...8 9 18 1500 15 YL270PG2530L F 1 270 30 7 8 80 37 9 9 27 1500 15 YL275PG2530L F 1 275 31 0 8 90 37 9 9 35 1500 15 YL280PG2530L F 1 280 31 2 8 98 38 0 9 43 1500 15 YL285PG2530L F 1 285 31 4 9 08 38 1 9...

Page 9: ...coefficient C 0 05 0 32 0 42 YLM G G 72CL F YL330DG2536L F 2 330 37 1 8 90 45 2 9 46 1500 15 YL335DG2536L F 2 335 37 4 8 96 45 4 9 51 1500 15 YL340DG2536L F 2 340 37 7 9 02 45 6 9 56 1500 15 YL345DG25...

Page 10: ...n and User Manual page 10 CLAMP INSTALLATION DRAWINGS OF PV MODULES UNITS mm YGE G G 60CL YGE G G 72CL YLM G G 60CL YLM G G 72CL 992 1975 360 635 635 350 200 992 1975 360 635 635 350 200 360 953 345 9...

Page 11: ...3 8 Grounding holes 8 6 1981 365 633 633 350 100 998 1981 32 1981 998 Drainage holes 8 3 8 Grounding holes 8 6 365 633 633 350 100 998 1664 32 1664 998 365 949 350 Drainage holes 8 3 8 100 Grounding h...