background image

Yingli Solar G/G Modules, Installation and User Manual 

page 6

Framed PV Module Mounting Mode

• 

Clamps selection

The manufacture of the clamp is responsible for providing an appropriate clamp 
and installation manual. Clamps length shall not be less than 50 mm (see Figure 
16).

Figure 16: Detail of a clamp

• 

 Bill of material

Table 4: Installation accessories

 Portrait orientation

 

mounting method

Step 1:

Place the clamps on the support beams at correct positions according to the 
module size. The exact values can be found in the “Module Supplement”. 

Step 2:

Place the inside hexagonal bolt into the clamp and screw it partly in the nut. Then 
insert the two into the beam.

 

Figure 18: Primary fixation clamp

Step 3:

Place the modules and tighten the bolts (It’s recommended to fix the clamps by 
M8 screws and tighten the screw with 16 N•m ~ 20 N•m torque, see Figure 19).

Figure 19: Tighten clamp 

Step 4:

Connect the frames by grounding wires (It’s recommended to fix by M5 screw 
and tighten the screw with 4 N•m torque), then make it earthing reliably.

Successively fasten clamps and connect framed PV modules (see Figure 20).

Figure 20: Framed G/G array

M A I N T E N A N C E

General

Yingli Solar recommends that PV systems be periodically inspected by the 
installer or other qualified person. 

The purpose of the PV system inspection is to ensure that all system 
components are functioning properly. At a minimum, this inspection should 
confirm the following:

•  All cables and connector attachments are undamaged and properly secured

• No sharp objects are in contact with the PV module surfaces

•  PV modules are not shaded by unwanted obstacles and/or foreign material

•  Mounting and grounding components are tightly secured with no corrosion

 Defects should be addressed immediately. 

 

Cleaning

Over time, dirt and dust can accumulate on the glass surface of the module, 
reducing its power output. Yingli Solar recommends periodic cleaning of PV 
modules to ensure maximum power output, especially in regions with low 
precipitation. 

In order to reduce the potential for electrical and thermal shock, Yingli Solar 
recommends cleaning PV modules during early morning or late afternoon 
hours when solar radiation is low and the modules are cooler, especially in 
regions with hotter temperatures. 

Name

Dimesion (mm)

Material

Clamp

Width * Height * Wall thickness

40×10×3.0

Aluminium alloy 6063 T5

Beam

Width * Height * Wall thickness

41×41×2.0

Galvanized steel

Nut

Suitable for M8 screw

Plastic

SUS 304

Grounding wire

Length * Sectional area

150×4.0 mm

2

Copper

Inside hexagonal bolt

M8 screw 

Spring washer

Flat washer

SUS 304

Figure 17: Installation accessories

Clamp

Inside Hexagonal Bolt

Nut

Beam

Grounding Wire

Summary of Contents for YGE G/G 60CL/F Series

Page 1: ...trol Failure to comply with the requirements listed in this manual will invalidate the Limited Warranty for PV modules as provided by Yingli Solar at the time of sale to the direct customer Additional...

Page 2: ...e short side of the box including the corresponding part of the upper lid and the bottom lid see Figure 4 Pay attention to not damage the modules during the cutting process Thirdly cut the two inner s...

Page 3: ...party electronic devices connected to PV modules may lead to mismatching and must be installed according to the manufacturer s specified instructions Figure 6 Electrical diagrams of series and parall...

Page 4: ...or optimal performance Yingli Solar recommends that the negative pole of the PV array be connected to ground Equipment Grounding The frame of the PV module as well as any exposed non current carrying...

Page 5: ...in the mechanical mounting instructions of this installation manual The installation shall follow the instructions below If the installation method is different from this manual please contact Yingli...

Page 6: ...taller or other qualified person The purpose of the PV system inspection is to ensure that all system components are functioning properly At a minimum this inspection should confirm the following All...

Page 7: ...e glass surface to enhance power output and reduce dirt and dust buildup In order to avoid module damage do not clean PV modules with a power washer or pressure washer Do not use steam or corrosive ch...

Page 8: ...8 9 18 1500 15 YL270PG2530L F 1 270 30 7 8 80 37 9 9 27 1500 15 YL275PG2530L F 1 275 31 0 8 90 37 9 9 35 1500 15 YL280PG2530L F 1 280 31 2 8 98 38 0 9 43 1500 15 YL285PG2530L F 1 285 31 4 9 08 38 1 9...

Page 9: ...coefficient C 0 05 0 32 0 42 YLM G G 72CL F YL330DG2536L F 2 330 37 1 8 90 45 2 9 46 1500 15 YL335DG2536L F 2 335 37 4 8 96 45 4 9 51 1500 15 YL340DG2536L F 2 340 37 7 9 02 45 6 9 56 1500 15 YL345DG25...

Page 10: ...n and User Manual page 10 CLAMP INSTALLATION DRAWINGS OF PV MODULES UNITS mm YGE G G 60CL YGE G G 72CL YLM G G 60CL YLM G G 72CL 992 1975 360 635 635 350 200 992 1975 360 635 635 350 200 360 953 345 9...

Page 11: ...3 8 Grounding holes 8 6 1981 365 633 633 350 100 998 1981 32 1981 998 Drainage holes 8 3 8 Grounding holes 8 6 365 633 633 350 100 998 1664 32 1664 998 365 949 350 Drainage holes 8 3 8 100 Grounding h...

Reviews: