2. Preparation
11
TI 01W01A56-01EN
2.3
Connecting Cable
2.3.1
Connecting Field Wireless Management Station Cable
Following connections are required to activate Management Station.
11
Configuration
& Monitoring PC
1.Field Network Port
3.Power Supply Connector
2.SynchronizationConnector
4.LED Indicator
RDY=Green
Field Wireless Management Station
Terminator of Cable for Redundancy
Synchronization connector
Power supply connector
Field network interface
1. Connect Ethernet cable from Field Network Port (F1) to the Configuration & Monitoring PC.
2. Plug the Terminator to the Synchronization connector.
3. Connect the power source to the power supply connector.
4. Confirm that the indicator LED RDY turns green.
• Management Station (YFGW410)
: RDY LED = Green