background image

036-21671-001 Rev. A (0106)

Unitary Products Group

7

ACCESSORIES

PROPANE (LP) CONVERSION KIT - 

1NP0680 - All units

This accessory conversion kit may be used to convert natural
gas (N) units for propane (LP) operation. Conversions must
be made by qualified distributor or dealer personnel.

CONCENTRIC VENT TERMINATION - 

1CT0302 (2")

1CT0303 (3")

CONDENSATE NEUTRALIZER KIT - 1HT0901

Neutralizer cartidge has a 1/2" plastic tube fittings for installa-
tion in the drain line. Calcium carbonate refill media is also
avaiable from the Source 1 Parts (p/n 026-30228-000).

SIDEWALL VENT TERMINATION - 

1HT0901 (2")

For use through rooftop, sidewall. Allows combustion air to
enter and exhaust to exit through single common hole. Elimi-
nates unslightly elbows for a cleaner installation.

COMBUSTIBLE FLOOR BASE - 

1CB0317 - 17 1/2” Cabinet
1CB0321 - 21” Cabinet
1CB0324 - 24-1/2” Cabinet

COIL TRANSITION - 

1TK0917 - 17 1/2” Cabinet
1TK0921 - 21” Cabinet
1TK0924 - 24-1/2” Cabinet
Required in downflow applications when using G*FD series 
coils.

ROOM THERMOSTATS - A wide selection of compatible
thermosets are available to provide optimum performance
and features for any installation.

1H/1C, manual change-over electronic non-programmable 
thermostat.

1H/1C, auto/manual changeover, electronic programmable,
deluxe 7-day, thermostat.

1H/1C, auto/manual changeover, electronic programmable.

* For the most current accessory information, refer to the
price book or consult factory.

Summary of Contents for Affinity PC9

Page 1: ...nducer operation Provides increased comfort level very quiet unit opera tion Adjustable delay timer allows two stage operation with sin gle stage thermostat Compact easy to install ideal height 40 cab...

Page 2: ...ls CFM Cabinet Size Cabinet Dimension A in B in C in D in E IN PC9B12N060DH11 1200 B 17 1 2 16 1 4 15 1 3 4 2 3 8 PC9B12N080DH11 1200 B 17 1 2 16 1 4 15 1 3 4 2 3 8 PC9C16N080DH11 1600 C 21 19 3 4 18...

Page 3: ...0 A C 1370 920 1560 1010 C B 1290 850 1470 940 B C 1130 790 1370 890 D B 1230 850 1460 930 C A 1050 720 1250 790 D A 1110 760 1310 810 C C 950 660 1090 690 D C PC9D20N120DH11 JUMPER SETTINGS CFM High...

Page 4: ...e following example Example For a 120 000 Btuh furnace operating on high speed blower it is found that total system static is 0 58 w c To determine the system airflow complete the following steps 1 Ob...

Page 5: ...Stage Cool Y First Stage Cool Y Y2 Single Second Stage Cool Y Single Stage Cool Y1 First Stage Cool RC 24 Volt Hot Cool XFMR RC 24 Volt Hot Cool XFMR RC 24 Volt Hot Cool XFMR HUM Dehumidification Ope...

Page 6: ...Humidity Rise Y1 First Stage Cool Y2 Second Stage Cool W2 Second Stage Heat Y2 Second Stage Cool Y First Stage Cool E W1 First Stage Heat Y2 Second Stage Cool R 24 Volt Hot R 24 Volt Hot R 24 Volt Ho...

Page 7: ...sidewall Allows combustion air to enter and exhaust to exit through single common hole Elimi nates unslightly elbows for a cleaner installation COMBUSTIBLE FLOOR BASE 1CB0317 17 1 2 Cabinet 1CB0321 2...

Page 8: ...ct to change without notice Printed in U S A 036 21671 001 Rev A 0106 Copyright by York International Corp 2006 All rights reserved Supersedes Nothing Unitary 5005 Norman Products York OK Group Drive...

Reviews: