JOHNSON CONTROLS
3
FORM 102.20-N1
ISSUE DATE: 7/06/2016
MANUAL DESCRIPTION
FORM NUMBER
York Air Handling Units Operation and Maintenance
102.20-OM1
Steps to Protect New Equipment Warranty
102.20-CL1
Air Handling Units
Start-up Checklist
100.00-CL1
Long-Term Storage Requirement - Field Preparation - Air Handling Units
50.05-NM3
Long-Term Storage Periodic Checklist and Logs - Air Handling Units
50.20-CL3
Limited Warranty
50.05-NM2
Electric Motor Warranty
50.05-NM2.2
Air Cooled Condensing Unit DX Coil Split System Applications and Piping Guidelines
50.40-ES3
Air Modulator Service & Warranty Procedure
SI0262
CHANGEABILITY OF THIS DOCUMENT
In complying with Johnson Controls’ policy for con-
tinuous product improvement, the information con-
tained in this document is subject to change without
notice. Johnson Controls makes no commitment to
update or provide current information automatically
to the manual or product owner. Updated manuals, if
applicable, can be obtained by contacting the nearest
Johnson Controls Service office or accessing the John-
son Controls QuickLIT website at
.
It is the responsibility of rigging, installation, and op-
erating/service personnel to verify the applicability of
these documents to the equipment. If there is any ques-
tion regarding the applicability of these documents,
rigging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of the
equipment prior to performing any work on the unit.
CHANGE BARS
Revisions made to this document are indicated with a
line along the left or right hand column in the area the
revision was made. These revisions are to technical in-
formation and any other changes in spelling, grammar
or formatting are not included.
ASSOCIATED LITERATURE