The air conditioner shall be deposited in the area established by local authorities, to facilitate its selective
recovery.
1.3.4 Handling
The unit must be moved using the metal rails provided for its installation and transport.
1.4 Technical data
1.4.1 Test conditions and correction factors
Test conditions
Voltage
Length of connec‐
tion
pipes
[m]
Summer
Winter
Out. temp. °C
Ind. temp. °C
Out. temp. °C
Ind. temp. °C
DB
TH
DB
TH
DB
TH
DB
TH
400
7,5
35
24
27
19
7
6
20
12
Correction factors for cooling capacities
Cooling capacity correction factors for different air flows to the nominal flows in the indoor coil
% Flow
80
90
100
110
120
130
Total capacity
0,96
0,98
1
1,016
1,032
1,046
Sensible capacity
0,945
0,973
1
1,038
1,075
1,118
Comp. absorbed power
0,98
0,99
1
1,009
1,017
1,025
Cooling capacity correction factors according to length and height between units
H
Vertical distance between the indoor unit and
the outdoor unit
L
E
Equivalent length of pipes between the indoor
unit and the outdoor unit
(consider a single line)
A
Outdoor unit above indoor unit
B
Indoor unit above outdoor unit
1
Indoor unit
2
Outdoor unit
A
B
1
2
1
2
A
B
1
Installation manual
1.4
Technical data
4
Summary of Contents for VCH-25A
Page 4: ...1 Installation manual...
Page 50: ...2 Wiring diagrams...