PIPEWORK ARRANGEMENT
The following are suggested pipework arrangements
for single unit installations, for multiple unit installa-
tions, each unit should be piped as shown in
on page 38 and Figure 13 on page 38.
Recom-
mendations of the Building Services Research As-
sociation.
LD06596
FIGURE 12 -
CHILLED LIQUID SYSTEM
LD06598
FIGURE 13 -
CONDENSER COOLING LIQUID
SYSTEM
FIGURE 14 -
PIPEWORK ARRANGEMENTS
LEGEND
LD06597A
ISOLATING VALVE - NORMALLY OPEN
ISOLATING VALVE - NORMALLY CLOSED
FLOW REGULATING VALVE
FLOW MEASUREMENT DEVICE
STRAINER
PRESSURE TAPPING
FLOW SWITCH
FLANGED CONNECTION
Isolating Valve - Normally Open
Isolating Valve - Normally Closed
Flow Regulating Valve
Flow Measurement Device
Strainer
Flow Switch
Flanged Connection
PRESSURE TAPPING
CONNECTION TYPES AND SIZES
For connection sizes relevant to individual models
refer to SECTION 9 – SERVICE AND TROUBLE-
Cooler Connections
Standard chilled and condenser cooling liquid connec-
tions are of the ANSI/AWWA C-606 groove type.
LD06601
FIGURE 15 -
COOLER CONNECTIONS
TABLE 2 -
CONDENSER / COOLER CONNECTIONS
NOMINAL
SIZE
OD
A
B
C
8”
8-5/8”
3/4
±1/32”
7/16
±1/32”
8.416”
6”
6-5/8”
5/8
±1/32”
3/8
±1/32”
6.433”
5”
5-9/16”
5/8
±1/32”
3/8 1/32”
5.395
Summary of Contents for YCWL0056SE
Page 4: ...FORM 201 26 NM1 ISSUE DATE 1 19 2018 JOHNSON CONTROLS 4 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 30: ...FORM 201 26 NM1 ISSUE DATE 1 19 2018 JOHNSON CONTROLS 30 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 146: ...FORM 201 26 NM1 ISSUE DATE 1 19 2018 JOHNSON CONTROLS 146 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 154: ...FORM 201 26 NM1 ISSUE DATE 1 19 2018 JOHNSON CONTROLS 154 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 168: ...FORM 201 26 NM1 ISSUE DATE 1 19 2018 JOHNSON CONTROLS 168 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 186: ...FORM 201 26 NM1 ISSUE DATE 1 19 2018 JOHNSON CONTROLS 186 NOTES...