FORM 201.24-NM2
25
YORK INTERNATIONAL
PIPEWORK ARRANGEMENT
The following are suggested pipework arrangements
for single unit installations. For multiple unit installa-
tions, each unit should be piped as shown.
Recommendations of the Building Services
Research Association
CONNECTION TYPES & SIZES
For connection sizes relevant to individual models re-
fer to Section 9.
Cooler Connections
Standard chilled and condenser cooling liquid connec-
tions are of the Victaulic groove type.
FIG. 6 – CHILLED LIQUID SYSTEM
FIG. 7 – CONDENSER COOLING LIQUID SYSTEM
FIG. 8 – PIPEWORK ARRANGEMENT LEGEND
FIG. 9 – COOLER CONNECTIONS
LD06596
LD06598
LD06597
LD06601
ISOLATING VALVE - NORMALLY OPEN
ISOLATING VALVE - NORMALLY CLOSED
FLOW REGULATING VALVE
FLOW MEASUREMENT DEVICE
STRAINER
PRESSURE TAPPING
FLOW SWITCH
FLANGED CONNECTION
NOMINAL
SIZE
OD
A
B
C
8"
8-5/8"
3/4
±1/32"
7/16
±1/32"
8.416"
6"
6-5/8"
5/8
±1/32"
3/8
±1/32"
6.433"
5"
5-9/16"
5/8
±1/32"
3/8
±1/32"
5.395
TABLE 2 – CONDENSER / COOLER CONNECTIONS
4
Summary of Contents for YCWS0313SC
Page 12: ...YORK INTERNATIONAL 12 THIS PAGE INTENTIONALLY LEFT BLANK TO MAINTAIN PAGE FORMAT...
Page 36: ...YORK INTERNATIONAL 36 THIS PAGE INTENTIONALLY LEFT BLANK TO MAINTAIN PAGE FORMAT Commissioning...
Page 86: ...YORK INTERNATIONAL 86 TYPICAL CONTROL PANEL WIRING Maintenance...
Page 87: ...FORM 201 24 NM2 87 YORK INTERNATIONAL TYPICAL CONTROL PANEL WIRING LD06957 8...
Page 103: ...FORM 201 24 NM2 103 YORK INTERNATIONAL NOTES 11...