JOHNSON CONTROLS
15
SECTION 1 – DESCRIPTION OF SYSTEM AND FUNDAMENTALS OF OPERATION
FORM 160.69-O2
ISSUE DATE: 9/30/2020
1
FIGURE 2 -
CHILLER OPERATION FLOW CHART
Chiller Standby
Select Lead Compressor
Is a Compressor in
Service Lockout
Select the other
Compressor
Select the Compressor
with Least Run Time
No
Yes
Open Lead Compressor
Discharge Valve
Electro-Mechanical Starter
Chiller Start Sequence
Auto zero the 3
Oil Pressure Transducers
Pre Lube cycle
Lead Compressor
Normal Sequence
(Extended prelube switch applies
only to lead compressor)
Is
Lead Compr
Disch Valve
Open?
> 40 seconds
Alarm/Fault
No
Yes
Start Lead Compressor
(normal sequence)
Enable capacity controls logic.
Lead compressor PRVs
responding to LChWT
Chiller Start
Requirement
Chiller Run
Single Compressor
Are
Compressor
Disch Valves
Closed?
Start Inhibit
No
YD Dual Compressor Chiller
LD10487
Summary of Contents for YD A
Page 8: ...JOHNSON CONTROLS 8 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 22: ...JOHNSON CONTROLS 22 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 28: ...JOHNSON CONTROLS 28 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 34: ...JOHNSON CONTROLS 34 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 48: ...JOHNSON CONTROLS 48 FORM 160 69 O2 ISSUE DATE 9 30 2020 THIS PAGE INTENTIONALLY LEFT BLANK...