JOHNSON CONTROLS
3
FORM 160.69-O1
ISSUE DATE: 9/30/2012
MANUAL DESCRIPTION
FORM NUMBER
Unit Startup Checklist
160.69-CL2
Wiring Diagram - Field Control Modifications
160.69-PW3
Wiring Diagram - Field Control Modifications With Electro-Mechanical Starter
160.69-PW2
Wiring Diagram - Unit With Electroc-Mechanical Starter
160.69-PW1
Renewal Parts - OptiView™ Control Center
160.69-RP1
Renewal Parts - Unit
160.69-RP2
YD with OptiView Control Center and EMS (Cooling Only) Operating Manual
160.69-O2
CHANGEABILITY OF THIS DOCUMENT
In complying with Johnson Controls’ policy for con-
tinuous product improvement, the information con-
tained in this document is subject to change without
notice. Johnson Controls makes no commitment to
update or provide current information automatically to
the manual owner. Updated manuals, if applicable, can
be obtained by contacting the nearest Johnson Controls
Service office.
Operating/service personnel maintain responsibility for
the applicability of these documents to the equipment.
If there is any question regarding the applicability of
these documents, the technician should verify whether
the equipment has been modified and if current litera-
ture is available from the owner of the equipment prior
to performing any work on the chiller.
CHANGE BARS
Revisions made to this document are indicated with a
line along the left or right hand column in the area the
revision was made. These revisions are to technical in-
formation and any other changes in spelling, grammar
or formatting are not included.
ASSOCIATED LITERATURE