SECTION 7 – MAINTENANCE
FORM 155.30-ICOM2.EN.UL
ISSUE DATE: 12/21/2018
7
LD19950
PI TI
PI TI
PI TI
PI TI
TH
Feeding Water
Strainer
Cooling
Water
Pump
Cooling Tower
Scope of Supply
Tapping for Chemical Cleaning
Chilled Water
Strainer
Chilled Water
Pump
Absorption Chiller
Cooling Water
Chilled Water and Cooling Water System
CHILLED WATER AND COOLING WATER SYSTEM
Chilled Water
Strainer
Chilled Water
Pump
Cooling
Water
Pump
Cooling Water
Scope of Supply
Absorption Chiller
Tapping for Chemical Cleaning
Cooling Tower
Feeding Water
Strainer
LD19950
NOTE:
1. The manufacturer recommends the installation of expansion joints for the hot water, chilled water, and cooling water connections.
2. If the hot water can enter the chiller during a chiller power failure, a hot water shutoff valve or a spring-return type hot water valve MUST be
installed on the inlet side of the hot water line.
FIGURE 61 -
CHILLED WATER AND COOLING WATER SYSTEM