Johnson Controls
33
Form 150.72-ICOM6
Issue date: 12/19/2023
3
Read carefully the rigging warning label
on the chiller packaging.
Section 3: Handling and storage
LD18119
Figure 6:
Rigging and lifting label
Rigging and lifting should only be done by
a professional rigger in accordance with a
written rigging and lifting plan. The most
appropriate rigging and lifting method
will depend on job specific factors, such
as the rigging equipment available and
site needs. Therefore a professional rig-
ger must determine the rigging and lifting
method to be used and it is beyond the
scope of the manual to specify rigging
and lifting details.