background image

T-720 Installation Manual 

 

T-720A: PROGRAMMED AT THE FACTORY FOR AUTO CHANGEOVER 

T-720B: PROGRAMMED AT THE FACTORY FOR COOLING ONLY 

 
 
 
 
 

·

 

Open the thermostat by pulling on the 
bottom side of the front cover 

 
 
 
 
 
 
 

 
 
 

·

 

Swing open the internal PCB to the left by 
pressing the PCB locking tabs 

·

 

Pull out cables 6" from the wall 

·

 

Insert cable in the central hole of the base 

·

 

Align base and mark the location of the two 
mounting holes paying particular attention to 
orienting the proper side of the base up 

·

 

Install anchors in the wall and insert screws in 
mounting holes on each side of the base 

·

 

Gently swing the circuit board back into the 
base until the tabs lock it in place 

 
 

Reviews: