![background image](http://html1.mh-extra.com/html/youngman-richardson-and-co/yr2700ar/yr2700ar_operators-manual_3574159005.webp)
5
INSTALLATION, LAST CHECKS & START
INSTALLATION:
•
Inspect shipment for damages during transit and unpack
•
Top engine fuel tank up with clean, fresh, Petrol or Diesel
WARNING
–
PLEASE READ SAFETY INSTRUCTIONS FIRST!
•
For portable machines
: Connection supply hose to water supply:
o
Important: Use hose with minimum 20 mm inside diameter
o
Required pressurised water supply (not gravity) with
minimum of 10 PSI and ~20% more flow that pump flow rate
(litres per minute)
o
Turn on the water supply (open tap fully).
•
Trailer-mounted units:
–
Ensure tank is half full with water. This will
ensure the float switch is activated otherwise the engine won’t start
•
Unroll the hose fully ensuring there are no kinks in it
•
Trigger gun to expel any air in the system
LAST CHECKS & START:
•
Check all hoses are connected and check for damage or water leaks
•
Check oil level in the pump & engine. The oil sight glass on the
pump should be no more than HALF full! If oil needs to be topped
up, use SAE10W40 or SAE 15W40 or SAE30
READ WARNINGS & SAFETY INSTRUCTIONS
BEFORE OPERATING MACHINERY