youngmangroup.com
20
StairMAX 700/850
Assembly Procedure
11
Climb up the inside
of the tower and
from the protected
position of the trapdoor,
fit horizontal braces as
guardrails, on both sides.
2
The temporary deck can now be removed.
If building to the next height, the 4 rung frame at
the lower end should be
replaced with a lift frame
(1.75m for 700/2.0m for 850).
The 4 rung frame should then
be positioned at the higher
end of te tower. Diagonal
braces, decks and guard
rails should be added as
shown in previous steps.
Fit guardrail braces from
the protected trapdoor
position. Do not climb
onto the platform until
it is fully guardrailed.
Fit toe boards
(instructions on page 21)
The tower is now complete.