background image

- 19 -

Installing YT-2300R with bracket

YT-2300R is supplied with standard bracket. The bracket is consists of 2 part and can

be used with Fork lever and Namur shaft. The bracket is assembled in the factory as

based on 20mm of actuator stem height. But if actuator stem height is higher than that

like 30mm, 50mm, reassemble the bracket adjusting to the height. Referring to the

following table, check the hole positions.

YT-2300R

Upper bracket A

Bottom bracket B

Actuator

Bracket assembly method by actuator stem height H

Actuator stem

height (H)

Markings of bolt holes

A-L

B-L

A-R

B-R

20mm

H : 20

H : 20, 30

H : 20

H : 20, 30

30mm

H : 30

H : 20, 30

H : 30

H : 20, 30

50mm

H : 50

H : 50

H : 50

H : 50

Ex) In case that H is 30mm, A-L should be locked in H:30 hole and B-L in H:20,30, A-R

in H:30, B-R in H:20,30 with bolts.

- 20 -

1. Usual types of actuator stem height (H) are 20, 30 and 50mm. After checking H,

assemble brackets as explained on the previous page. The bracket is set as 20mm type

in the factory.

Actuator stem

Actuator

Actuator stem height (H=20mm)

2. Attach bracket to the actuator using hexagon head bolts or wrench bolts. Diameter of

bracket bolt holes is 6mm. Use spring washers or any other equipment so as the bolts

not to be loosened by vibration or impact. The direction of bracket is different by

operating conditions, but normal direction is as following picture. That is, when the piping

of actuator and YT-2300R is direction A, bracket hole and indicator attached on the

bottom of YT-2300R main shaft should be same direction as being half circle.

Direction A

Attachment direction of bracket and actuator

3. Set rotation position of actuator stem as initial zero point which is stroke 0%. In case

of spring return type single actuator, since the actuator stem is always rotated at zero

point without supply pressure, it is easy to check zero point. If the actuator is double

acting, check that whether it is clockwise or counter clockwise or the rotation direction of

actuator stem with using supply pressure.

4. Set actuator stem as initial zero point and install fork lever as the following picture.

Ensure the position of initial zero point when actuator stem is clockwise or counter

clockwise. Installation angle of fork lever should be about 45 degree based on the linear

shaft. But the angle is not related to Namur shaft.

Summary of Contents for YT-2300 Series

Page 1: ...2300L installation 13 Example 13 Installing YT 2300L with bracket 14 YT 2300R installation 18 Example 18 Installing YT 2300R with bracket 19 Piping connection 22 Note 22 Conditions of supply pressure...

Page 2: ...oducts Our products are produced and inspected under the strict standards In order to use the products appropriately and efficiently we recommend that users read this manual carefully and fully unders...

Page 3: ...hunting is controlled to the optimum condition during operation 9 Hart communication makes to process various information of valve and positioner 10 Valve system is stable by outputting analog feedba...

Page 4: ...7 MPa Serial number The numbers given each product By tracking this number various information for the item can be collected YT 2300 Label 8 Ordering number YT 2300 series use the following ordering...

Page 5: ...r Quick Open EQ User Set 16 Point Vibration Effect 6G Humidity 5 95 RH at 40 Communication Option HART Communication Non DDL Feedback Signal Option 4 20mA DC 10 30V Material Aluminum Diecasting Weight...

Page 6: ...must be shut down In order entire system not to shut down the control valve must be separated from the system by bypass valve or other equipment No pressure remains in the actuator YT 2300L drawing Y...

Page 7: ...it is necessary to make proper bracket to attach on actuator yoke The most important things in making bracket are as follows 1 YT 2300L feedback lever should be level at 50 of valve stroke Refer to n...

Page 8: ...e stroke Connection of supply pressure pipe between actuator and air filter regulator 16 6 Insert connection bar attached on actuator clamp into the slot of YT 2300L feedback lever Ensure that inserti...

Page 9: ...feedback lever reaches to the lever stopper move attachment position of YT 2300L to the direction becoming more distant from yoke center Check whether or not lever stopper and feedback lever is conta...

Page 10: ...r using hexagon head bolts or wrench bolts Diameter of bracket bolt holes is 6mm Use spring washers or any other equipment so as the bolts not to be loosened by vibration or impact The direction of br...

Page 11: ...pring This is to fit the main shaft of YT 2300R and the center of actuator stem If they are not fitted product durability is getting worse due to too much force on the main shaft of YT 2300 22 Connect...

Page 12: ...pipe whose inner diameter is more than 6mm outer diameter 10mm 4 Do not connect the pipe too long It affects flow rate due to the friction inside the pipe Piping connection with actuator Single actin...

Page 13: ...nstall the cable near the equipment such as high capacity transformer or motor generating noise The following is terminal part of YT 2300 series Terminal plate of YT 2300 Terminal connection of curren...

Page 14: ...ground cable terminal to prevent it coming out A M switch Auto Manual switch There is A M switch on the bottom of YT 2300 If this switch is set as auto supply pressure is transmitted to actuator by t...

Page 15: ...gnal There are six types displayed in Run mode Run PV Valve stroke of Process Value Run SV Input signal of Set Value 0 100 Run SV mA Input signal of Set Value 4 20mA Run MV Motor controlled variable o...

Page 16: ...TO CAL The calibration of YT 2300 is simply performed by Auto calibration and there are 5 types of Auto calibration as AUTO1 AUTO2 AUTO3 BIAS V_0 AUTO1 calibration is useful for users in the field and...

Page 17: ...line on LCD indicates the value close to zero After valve is stopped Usually the number is between 2 to 2 If the number is over 5 execute this function again and reset V_0 value 1 Push DOWN at BIAS m...

Page 18: ...r 6 seconds and AUTO CAL message is appeared 2 Push DOWN twice and PARAM mode is displayed 3 Push ENTER and dEAdZONE mode is displayed 4 Push ENTER again and EAdZONE message is appeared 5 Adjsut dEAdZ...

Page 19: ...WN twice 3 Push ENTER for 6 seconds 4 Push DOWN twice 5 Push ENTER 6 Push ENTER after adjustment with UP DOWN 38 7 Push ESC 8 Push ESC twice RUN Mode Kd 1 3 Adjustment method and procedure is as same...

Page 20: ...to RUN mode 6 In order to change valve end point push DOWN at PV_ZERO mode and PV_END mode is started 7 Push ENTER at PV_END mode and PE mode is displayed At this mode it is available to change valve...

Page 21: ...42 Valve mode This mode is to adjust the various characteristics Action type ACT It is set Direct Action DA and Reverse Action RA Characteristics CHAR It is set Characteristics There are three types...

Page 22: ...d ACT RA or ACT DA is displayed 2 Push DOWN twice then USER SET mode is started 3 Push ENTER P0 SET mode is displayed and at this mode users can adjust the first point of characteristic in sixteen poi...

Page 23: ...ode 1 Push DOWN 2 Push ENTER 3 Push ENTER four times after adjustment with UP DOWN 4 Push ESC RUN Mode three times 46 Adjustment of Split Range SPLIT 1 Push ENTER at VALVE mode and ACT RA or ACT DA is...

Page 24: ...ause Measures A None None B The range of Pv Span Pv Zero is less than 500 Operating angle of feedback is too small Adjust operating angle of feedback lever to be bigger Refer P 13 and execute AUTO 1 c...

Page 25: ...Kyeonggi Do Korea TEL 0082 31 986 8545 FAX 0082 31 986 2683 E mail ytc ytc co kr Homepage http www ytc co kr http www positioner biz This information contained in this catalogue is subject to change w...

Reviews:

Related manuals for YT-2300 Series