- 15 -
4. Install bar connected with YT-2300L feedback lever on the actuator clamp. The slot
length between YT-2300L feedback lever is 6.5mm, so the diameter of connection bar
should be less than 6.3mm.
Installation of actuator clamp and connection bar
5. Connect air filter regulator with the actuator temporarily. Set supply pressure of air
filter regulator in order that actuator clamp is positioned at 50% of valve stroke.
Connection of supply pressure pipe between actuator and air filter regulator
- 16 -
6. Insert connection bar attached on actuator clamp into the slot of YT-2300L feedback
lever. Ensure that inserting should be the following picture in order to reduce hysterisis.
The connection bar inserted correctly between feedback lever and lever spring
7. Check if YT-2300L feedback lever is level at 50% of valve stroke. If not, make it be
level with moving bracket or feedback link bar. If YT-2300 is installed not being level at
50% of valve stroke, product linearity becomes worse.
Feedback lever being leveled correctly