73
match the center of the tracks.
4)
Remove the rope holding the machine in place.
5)
Start the engine. In winter, perform a thorough warm-up operation.
6)
Lower the left control box.
7)
Lift up the arm and bucket, and lift the dozer.
8)
Check that there are no obstacles within the excavator's range of motion.
9)
Pull up the platform locking pin, make the platform rotate 180 degrees, the
digging device is facing the slope, and the excavator is in the forward direction.
10)
Slowly travel to the top of the hitch, extend the arm outward, make the excavator
track tilt down to the ramp, and then slowly travel to the ground.
4.15.5.
Lifting machine
A)
Safety rules
1)
Do not lift the machine when there are people on the machine.
2)
Be sure that the wire rope used to lift the machine is strong enough to carry the
weight of the machine.
3)
Do not lift the machine in any position other than the one provided in the
following procedures, otherwise there is a risk of tipping over.
4)
Do not lift the machine with the superstructure turned to the side. Before lifting,
rotate the platform so that the work device is oriented in the same direction as the
dozer and so that the tracks are parallel to the superstructure.
5)
When lifting, keep the machine level.
6)
Do not walk under the machine when lifting.
B)
Lifting procedures
ATTENTION: Lifting procedures apply to machines of standard technical
specifications. The hoisting devices should have capacity sufficient to lift the
weight of the machine.