The description of switching sequence is affixed to the master power switch.
The switching on sequence follows:
Master power → Blower → Air pump → Water pump → Laser power
The switching off sequence is reverse:
Laser power →Water pump →Air pump →Blower → Master power
First plug the master power line (located on the back of the machine) into the patch board, connect to
the power supply, and then toggle up the blue switch to turn on the equipment, as shown below:
Figure 3-23
Master Power Switch
After turning on the master power supply, the lamp inside the machine will be lighted automatically;
Then move the rocker switch on the right side of the chassis, and turn on the water pump, fan and air
pump respectively.
After the above steps, the equipment is turned on. The shutdown procedure is reverse.
3.3.2
Movement debugging
The movement debugging is mainly used to test whether the state of each motion axis of the equipment is
normal. The movement debugging has been done in the factory. If no accident occurs in the transportation and
installation process, the equipment wouldn’t have problem in movement. Below is the description in aspect of
motor shaft movement, stroke, limit and reset, straightness and squareness test.
Attention
Please operate in accordance with the required sequence, or else it may cause equipment
malfunction.