background image

Revised 03-11-10

 

 

 

 

YUNCA FUZiON FEBRUARY 2010 

 

 

Page 3 of 19 

INTRODUCTION 

 

Welcome and congratulations on purchasing your YUNCA FUZiON (Fuzzy Logic Control) 
FLUED GAS HEATER. 

 
Please read the following carefully before attempting to operate the heater and ensure all members 
of your home understand how this elegant and highly efficient heater functions. 
 
Please fill out and return the registration card promptly (back page)  
 
These instructions should be stored in a convenient safe place for ready reference. If you have any 
questions regarding your heater please contact your YUNCA dealer. 
 
The YUNCA 

FUZiON

 (Fuzzy Logic Control) FLUED GAS HEATER is a gas-fired, conventionally 

vented, room heater tested by independent laboratories to Australian and New Zealand standards. 
 
Electronic ignition and operation is by an infra-red remote control handpiece (Ref page 8 – 10). 
However if your remote is mislaid or damaged there is a convenient manual control panel (page 11) 
on the front of the fire. Both the remote and the control panel feature “kiddy-lock” controls for added 
peace of mind. We highly recommend the use of the two-speed fan boost on the fire for greater 
heating efficiency. 
 
Should  power  not  be available for  any  reason,  battery  back  up  through  two  “D”  sized  batteries 
ensures the fire will continue to operate (without the fan boost). Ref page 12.  
 
The installation of the YUNCA 

FUZiON 

(Fuzzy Logic control) FLUED GAS HEATER must be carried 

out by a suitably qualified person and comply with the current New Zealand installation code, NZS 
5261:2003. 
 

WARNING

:

 

This appliance must be flued to atmosphere

 
Installation and  repair of  the  YUNCA 

FUZiON

  FLUED  GAS  HEATER  must be  carried out  by  a 

qualified person.  
 

The appliance should be serviced at least annually by a qualified service person. 

Control valve 

compartments, burners, fan, and air circulating passageways of the FUZiON must be kept free from 
any lint and dust build-up to ensure efficient and safe operation of the heater. 
 
 

CAUTION: DO NOT PLACE ARTICLES ON OR AGAINST THIS APPLIANCE. 

This particularly applies to the remote control handpiece! 

 

WARNING: DO NOT USE OR STORE FLAMMABLE MATERIALS 

NEAR THIS APPLIANCE. 

 

WARNING:

 

DO NOT SPRAY AEROSOLS IN THE VICINITY OF THIS 

APPLIANCE WHILE IT IS OPERATIONAL. 

 
 

Summary of Contents for Fuzion

Page 1: ... FEBRUARY 2010 Page 1 of 19 FUZiON FUZZY LOGIC control FREESTANDING GAS HEATER FEBRUARY 2010 INSTALLATION OPERATION MAINTENANCE WARRANTY INFORMATION These instructions should be stored in a convenient safe place for ready reference ...

Page 2: ...TROL AUTO TIMER 8 10 MANUAL CONTROL OPERATION 11 MAINTENANCE 11 16 DOOR REMOVAL GLASS REPLACEMENT 11 GLASS CLEANING DOOR ROPE REPLACEMENT 12 BATTERY BACK UP 12 SERVICE INSPECTION AND CLEANING 13 GAS CONTROL VALVE CONNECTIONS 13 FAN REMOVAL 14 TROUBLE SHOOTING GUIDE 15 16 Appendix A PARTS LIST 17 Appendix B INJECTOR SIZES 17 Appendix C WARRANTY 18 Appendix D WIRING DIAGRAM 18 Appendix E WARRANTY RE...

Page 3: ...eature kiddy lock controls for added peace of mind We highly recommend the use of the two speed fan boost on the fire for greater heating efficiency Should power not be available for any reason battery back up through two D sized batteries ensures the fire will continue to operate without the fan boost Ref page 12 The installation of the YUNCA FUZiON Fuzzy Logic control FLUED GAS HEATER must be ca...

Page 4: ...loor or roof joist Refer to page 5 for typical flue installation Fig 2 To obtain maximum heat distribution with any freestanding heater a ceiling fan may be fitted When the appropriate position has been selected the unit must be bolted to the floor to ensure that the unit remains upright in the event of an earthquake or similar Fig 1 below If the heater is being attached to a concrete floor dyna b...

Page 5: ...Revised 03 11 10 YUNCA FUZiON FEBRUARY 2010 Page 5 of 19 Fig 2 ...

Page 6: ... below Fig 3 and comply with NZS 5261 AG601 This is to ensure adequate air circulation around the heater and avoid heat damage to wall coverings Note If walled surface is non combustible i e brick or steel side clearances may be reduced to 100mm however note that this may severely restrict access to the appliance for servicing Corner positions and back clearance remains the same See Fig 3 Below Fi...

Page 7: ...ECK GAS PRESSURE 1 Remove door assembly refer page 11 2 Remove front hearth and control panel assembly Three screws hold the hearth and two screws hold the control panel locked under sides 3 Test point can be seen on the left side of the control box 4 Slacken test point screw and check pressures 5 Re tighten test point screw GAS PRESSURE REQUIREMENTS Correct gas pressure and the use of a properly ...

Page 8: ...Revised 03 11 10 YUNCA FUZiON FEBRUARY 2010 Page 8 of 19 FUZiON INFRA RED REMOTE CONTROL with AUTO TIMER N B DO NOT LEAVE THE REMOTE CONTROL ON TOP OF YOUR FIRE ...

Page 9: ... two speed fan is designed to quickly transfer heat around the room and ensures the most economic gas use The three position switch LOW OFF HIGH is located under the front hearth panel to the right of the manual control AUTO FUNCTION To set this feature you will need to ensure the remote control is on as advised above and ensure the CLOCK time and day are correctly set PLEASE NOTE If a key is not ...

Page 10: ...u will see the AUTO symbol display on the LCD screen of the remote control unit IMPORTANT Press AUTO SET button again to cancel the auto feature or the fire will continue to operate to the automatic settings even if the remote is off NOTE Even when AUTO SET is activated i e the display shows AUTO on the remote and the green light on the fire is flashing you can continue to operate the fire i e tur...

Page 11: ...REMOVING THE GLASS FOR REPLACEMENT 1 Remove the front door as described above and place front down on a soft surface 2 Remove the screws around the perimeter of the inner door and lift clear 3 The glass and old thermotape seal can be lifted clear and discarded 4 New glass 1610BX and thermotape seal 1611BX can be ordered through your YUNCA agent Note Only recommended heat resistant glass may be fit...

Page 12: ...2 Remove the existing gasket and clean the channel of all loose material 3 Lay the gasket in the channel ensuring the gasket is not stretched 4 Replace the door carefully to avoid dislodging the gasket BATTERY BACK UP REPLACEMENT Your YUNCA GAS FUZiON Fuzzy Logic control will operate WITHOUT FAN BOOST if power is not available for any reason Two D size batteries are located under the front hearth ...

Page 13: ...paper and carefully place it out of the way 3 The bark tray can be removed by undoing the attachment screws and lifting out 4 With firebox empty a vacuum cleaner can be used to remove any visible dust and lint from within the firebox area 5 Replace the bark tray 6 Replace log set 7 Replace the front door CLEANING UNDER THE TOP AND LOUVRES Two screws at the back and two lugs at the front hold the t...

Page 14: ...Main Power first 1 Remove the Door and Top Louvre see page 11 2 Remove 3 screws holding Hearth 3 Unplug White connector Block 4 Disconnect EARTH Wire from Control Valve Bracket 5 Unscrew 2nd EARTH Wire from Hearth 6 Loosen 4 screws holding Fan to the Back Panel keyhole slots 7 Remove Fan Back Panel Fan Screws Hearth ...

Page 15: ...eplace Pilot Set or re drill the injector Nozzle diameter LPG 0 35 mm NG 0 55 mm Replace POSSIBLE CAUSE AC Power IS unplugged or loose or the fuse has a short Battery power is too low when using DC power Battery Box has a failure or the connector pins are loose IR Receiver Fig 4 is covered POWER button of Remote Control Unit was not pressed for long enough Remote Control Unit has failed or there i...

Page 16: ...he terminals have loosened Valve M has a failure or Nozzle of Valve M is blocked Front Control Board has a failure Remote Control Unit has a failure The wire set has a failure or the terminals have loosened Valve L has a failure or Nozzle of Valve L is blocked Front Control Board has failed Remote Control Unit has failed Front Control Board has a failure Timer control incorrectly set e g am or pm ...

Page 17: ...position rocker switch 6624G Fan assembly QLZ06 1200 complete 6611G Otago Bay Log Set assembly 6611C Cross Logs Set of two left right twigs 1608FZ Door rope gasket 1610BX Glass 1611BX Glass thermotape seal 8315Fz Top panel Gunmetal 8115Fz Louvre 88 JL Left side panel State Colour 88 FzR Right side panel State Colour 89 Fz Main door State Colour 8900JJ2 Inner Door Panel frame 91 Fz Hearth Panel Sta...

Page 18: ...r any other indirect incidental cause are not covered by this warranty This warranty is void if the recommended service schedule is not implemented and carried out by a suitably qualified person as suggested in this manual Limitations of Liabilities Yunca Heating hereby waivers any liability for incidental and consequential damage directly or indirectly sustained or for any loss caused by the appl...

Page 19: ...Telephone Where Purchased Installed By Date Designed and Manufactured by Yunca Gas Dunedin PO Box 500 DUNEDIN 9054 Telephone 03 488 4342 Email dunedin yunca co nz Cut along here This section must be returned within 10 days of purchase YUNCA FUZiON WARRANTY REGISTRATION Serial No Gas Type Purchase Date Purchasers Name Purchasers Address City Postcode Telephone Where Purchased Installed By Date Retu...

Reviews: