Page 1: ...Page 1 of 9 PIAZZA PATIO HEATER 29 10 10 PIAZZA All SEASONS PATIO HEATER AUGUST 2010 OPERATIONS MAINTENANCE WARRANTY INFORMATION PLEASE RETAIN THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE ...

Page 2: ...tay with the appliance and is for the reference of the user and service person Only authorised service technicians should undertake any repairs or maintenance on this product It is recommended that the Heater has an annual maintenance check to ensure correct long term operation WARNING Do not store or use aerosols or other flammable materials near this appliance WARNING The Yunca All Seasons Patio...

Page 3: ...N TO POLE 4 POSITION COLUMN PIPE TO SOCKET 5 ALIGN HOLES SO THAT THE BOLT CAN PASS THROUGH 6 SECURE POLE INTO POSITION USING LOCK NUT 7 FASTEN BOTTLE SUPPORT LEG USING WINGNUT 8 BOLT DOME ONTO TOP SECTION Bracket Base Plate Leg and Column Support Gas Pipe Lock nut Bottle Support Leg Wing Nut Column Washer Hose Connection Wing Nuts 3 ...

Page 4: ...n full The heater will effectively heat a radius of around 3m so its position should be chosen to allow efficient use of heat without impeding peoples movement WARNING The clearances shown below are to be maintained at all times extra care should be taken when heater is used under tarpaulins or in marquees The base of the heater is filled with sand before assembly This improves stability of the Pa...

Page 5: ...hen running on Natural Gas the heater can be left mobile and connected to an approved bayonet fitting or may be permanently mounted and piped If the heater is being installed permanently connected to the supply a manual isolating valve should be installed as close as is practical to the appliance To get the maximum life from this product we suggest that it is covered when stored The Piazza All Sea...

Page 6: ...ure 7 Release the control knob slowly and turn to the flame setting required Changing a bottle LPG When the flame turns abnormally yellow and becomes smaller it is time to change the gas bottle To do this simply slide the round cylinder cover up the main stem to expose the gas cylinder Shut off gas supply at the gas bottle Remove the leg that is held on with a wing nut Disconnect regulator from th...

Page 7: ...omponents the perforated sheet metal cylinder that surrounds the control must be removed This is done by removing the screws top and bottom and the channel section pilot pipe cover As with all gas appliances regular servicing will improve the trouble free operation of this appliance This service should cover the following Leak test all joints Check operating pressures Clean main and pilot orifices...

Page 8: ...by the application of this product not in accordance with the current printed instructions Our liability is expressly limited to replacement of defective goods as per above warranty Any claim shall be deemed waived unless made in writing to us within 30 days from the date that it was or reasonably should have been discovered Injector Sizes GAS TYPE MAIN JET PILOT JET NATURAL 2 80mm diameter 0 35mm...

Page 9: ...nstalled By If permanent installation Date Manufactured in Dunedin by Yunca Gas PO Box 500 Dunedin 9054 Ph 03 488 4342 Email dunedin yunca co nz Cut along this line This section must be returned within 10 days of purchase Serial No Gas type Purchase Date Purchasers Name Purchasers Address City PostCode Telephone 0 Where Purchased Installed By If permanent installation Date Return to Yunca Heating ...