Page 3 of 9
PIAZZA PATIO HEATER
29/10/10
ASSEMBLY OF HEATER
1/
BOLT LEGS TO LEG & COLUMN SUPPORT
2/
BOLT LEGS TO BASE
3/
SLIDE CYLINDER ON TO POLE
4/
POSITION COLUMN PIPE TO SOCKET
5/
ALIGN HOLES SO THAT THE BOLT CAN PASS
THROUGH
6/
SECURE POLE INTO POSITION USING LOCK NUT
7/
FASTEN BOTTLE SUPPORT LEG USING WINGNUT
8/
BOLT DOME ONTO TOP SECTION
Bracket
Base Plate
Leg and Column
Support
Gas Pipe
Lock nut
Bottle Support Leg
Wing Nut
Column
Washer
Hose Connection.
Wing Nuts (3)