YZ Systems, Inc. 3101 Pollok Drive Conroe, Texas USA 77303 P: 936.788.5593 F: 936.788.5720
Page 24
DP-2010 TP ver.10012004
S
ECTION
7: P
ROGRAMMING
FOR
P
ROPORTIONAL
-
TO
-T
IME
W
/DPS-2
3. Adjust the pump volume adjustment knob to
the value used in the calculations in step 1.
4. Turn mode switch 1 to on.
5. Turn mode switch 2 to on.
6. Turn mode switch 3 to off.
7. Turn mode switch 4 to off.
8. Press the test button once to initiate the
timer sequence.
Number of turns open on the pump volume knob
3
6
12
Sample pump displacement per stroke
.1cc
.2cc
.4cc
5[UVGO
/WVWCN
#RRTQXGF
(CEVQT[
IMPORTANT NOTE:
For the Z-65 to operate the DP-2010 System, a
minimum pressure differential of 3" of water
must exist between the high pressure and low
pressure ports of the DPS-2.
figure 16
figure 17
Summary of Contents for DynaPak DP-2010TP
Page 1: ...DynaPak GasSampler S Y S T E M S U P P O R T M A N U A L DP 2010TP ...
Page 2: ......
Page 3: ...DP 2010TP INSTRUCTION OPERATING MANUAL Version 10012004 ...
Page 4: ......
Page 65: ......