YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720
Page 9
DP-2010UX ver.04152005
SSSSS
ECTION
ECTION
ECTION
ECTION
ECTION
2:
2:
2:
2:
2: S
S
S
S
S
Y
YY
YYSTEM
STEM
STEM
STEM
STEM
I
I I
I I
NST
NST
NST
NST
NSTALLA
ALLA
ALLA
ALLA
ALLATION
TION
TION
TION
TION
Optional DPS-2 Installation:
a. With the low pressure supply valve and the high
pressure supply valve closed, connect the DPS-2
to the orifice connection tubing.
b. Open the equalization valve.
c. Open the low pressure supply valve or the high
pressure supply valve.
IMPOR
IMPOR
IMPOR
IMPOR
IMPORTTTTTANT NO
ANT NO
ANT NO
ANT NO
ANT NOTE:
TE:
TE:
TE:
TE:
Do not open either the low pressure supply valve
or the high pressure supply valve without ensuring
that the equalization valve is open. Failure to do
so may damage the DPS-2's internal components.
d. Open the other supply valve.
e. Close the equalization valve.
f. Run the free end of the DPS-2 cable through
the cable entry connector located on the upper left
side on the DynaPak 2010 enclosure.
g. Connect the DPS-2 cable as shown in the
diagram.
h. Tighten the cable entry connector, allowing for
enough cable length to open the enclosure.
High Pressure Supply Valve
Orifice Connection
Equalization Valve
Low Pressure Supply Valve
Flow
Low Pressure
High Pressure
Factory
Approved
System
Mutual
Clear
Black
IMPOR
IMPOR
IMPOR
IMPOR
IMPORTTTTTANT NO
ANT NO
ANT NO
ANT NO
ANT NOTE:
TE:
TE:
TE:
TE:
For the Z-65 to operate the DP-2010 System, a
minimum pressure differential of 3" of water must
exist between the high pressure and low pressure
ports of the DPS-2.
figure 6