background image

NJEX

6300G & 7300G

N A T U R A L  G A S  O D O R I Z A T I O N  S Y S T E M 

Summary of Contents for NJEX 6300G

Page 1: ...NJEX 6300G 7300G N A T U R A L G A S O D O R I Z A T I O N S Y S T E M...

Page 2: ......

Page 3: ...NJEX 6300G 7300G Instruction Operating Manual Version 08 2021...

Page 4: ......

Page 5: ...ystem Components 5 System Flow Schematic 6 Standard System Mounting 7 Standard System Connections 8 Skid System Components 10 System Flow Schematic 12 Skid System Mounting 13 Skid System Connections 1...

Page 6: ...MODBUS Address 30 MODBUS Parameters 31 Conclusion 31 Section 6 Programming for Proportional to Time Operation 33 Setting Operator Input Parameters 33 Pump displacement in cc stroke 33 Odorant density...

Page 7: ...ltage 50 Battery Alarm 50 Flow Input 50 Flow Input Alarms 50 Flow Input Indicators non alarm 50 Tank Level 51 Tank Level Alarm 51 Odorant Temperature 51 Section 9 Setting Testing Alarms 53 Setting Ala...

Page 8: ...m Non Alarm Indicator Troubleshooting Steps 85 Loss of Flow Alarm Troubleshooting Steps 85 Overflow Alarm Troubleshooting Steps 85 Low Flow Non Alarm Indicator Troubleshooting Steps 86 Overflow Non Al...

Page 9: ...ed View 99 NJEX Model 7300 Pump Check Valve Assembly Exploded View 100 NJEX Model 6300 Pump Check Valve Assembly Exploded View 101 Fill Valve Exploded View 102 7300 Verometer with Filter Assembly Expl...

Page 10: ......

Page 11: ...ectronics the manual will begin discussing the in depth opera tion of the N 300 electronic controller where many of these typographic conventions will be found In the discussion about the controller t...

Page 12: ...supply may be required Where the actuation gas supply has a high water content and or a low hydrocarbon dew point additional actuation gas filtration or heating of the actuation gas supply may be nece...

Page 13: ...tems with analog inputs if a loss of flow signal occurs the controller automatically defaults back to a pre select ed percentage of the flow input The flow input signal is read by the N 300G controlle...

Page 14: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 4 NJEX EUR ver 08 2021 Section 1 First Things To Know About The NJEX Notes...

Page 15: ...t inlet manifold equipped with 1 4 FNPT connection located on the back of the System Enclosure Service Tray Not Illustrated should be installed in the bottom of the system enclosure to capture any dro...

Page 16: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 6 NJEX EUR ver 08 2021 Section 2 System Installation System Flow Schematic Figure 4...

Page 17: ...29mm provided in the bottom of each leg of the enclosure Recommended bolt stud sizes for mounting the enclosure is 1 2 12 7mm 2 In order to satisfy NEC requirements you must connect a ground wire fro...

Page 18: ...re refer to the Wiring Control Document on page 117 in Appendix D 2 Connect the flow signal device to the termination block located in the system control enclosure figure 6 refer to the Wiring Control...

Page 19: ...re should be acceptable P L pressure above 13 8 Bar need a dual cut regulation process 1 Install the primary regulator on the pipeline Fisher 1301 YZ P N A3 0274 or similar and adjust it to provide 10...

Page 20: ...e standard with an electronic level indicator factory connected to the N 300G controller The controller has an alarm capa bility to indicate when the liquid level in the storage tank has fallen below...

Page 21: ...enclosure Mechanical Interconnect Cable figure 9 pro vides the connection between the system control enclosure and the electrical components located in the mechanical section Expansion Tank figure 10...

Page 22: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 12 NJEX EUR ver 08 2021 Section 2 System Installation Figure 11 System Flow Schematic...

Page 23: ...bottom of the skid by forklift or other sup portive device c Do not move a system with liquid in the odorant tank d Do not lift a system by the tank lugs these lugs are designed only for the weight of...

Page 24: ...USA 18974 P 281 362 6500 www yzsystems com Page 14 NJEX EUR ver 08 2021 Section 2 System Installation CONTAINMENT SKID SYSTEMS TANK CABINET BL BW O L W WEIGHT Liters mm mm mm mm mm kg 230 Simple 1422...

Page 25: ...e refer to the Wiring Control Docu ment on page 117 in Appendix D 2 Connect the flow signal device to the termination block located in the system control enclosure figure 6 refer to the Wiring Control...

Page 26: ...ssure above 13 8 Bar need a dual cut regulation provess 1 Intall the primary regulator on the pipeline Fisher 1301 YZ P N A3 0274 or similar and adjust it to provide 10 3 Bar to the secondary regulato...

Page 27: ...10 V11 and V15 Note Gas Supply to V13 should NOT be turned on during this procedure 2 Attach inert or natural gas supply to V10 Section 3 Filling the Bulk Odorant Tank 3 To purge the tank open valve V...

Page 28: ...anufacturer during this time If you are uncertain about any aspect of the odorant itself you should contact the manufacturer of your chemical prior to proceeding 1 Place the N 300G controller in the S...

Page 29: ...on capabili ties Each key is labeled with it s primary function used in moving through the menu they are as follows Select Enter The Select Enter Key Up Arrow Key Down Arrow Key These keys also have a...

Page 30: ...osure door See figures 21 22 23 Next you may have the option of accepting a set of Pre Configured operating parameters that have been programmed into the Sentry Module figure 24 This option will only...

Page 31: ...operator to locally inhibit the operation of the N 300G controller This creates a standby mode for the NJEX system In the event of a no flow condition in the pipeline the operator can switch the NJEX...

Page 32: ...r to the Wiring Control Document on page 117 in Appendix D 2 Connect the flow signal device to the termination block located in the system control enclosure figure 6 refer to the Wiring Control Docume...

Page 33: ...notify the computer and provide it with information Connections for Method 1 or 2 are via an RS 485 two wire connection In a safe nonhazardous area this may be connected to a RS 232 converter for inte...

Page 34: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 24 NJEX EUR ver 08 2021 Section 4 System Control Electronics Notes...

Page 35: ...the value When a new value has been cho sen press the Enter key to store the new value into memory The entered value will stop flashing when it has been loaded into memory Press the Down Ar row key to...

Page 36: ...here the operation is not desired This setting will override the max time stroke setting parameter When flow again increases above the preset point the N 300G resumes operation To set the low flow shu...

Page 37: ...tions To set the maximum time stroke figure 37 press and release the Select key The value entry will begin to flash when selected Use the Up Arrow key to increase the value and the Down Arrow key to d...

Page 38: ...hen it has been loaded into memory the High Level value will begin to flash Use the Up Arrow key to increase the value and the Down Arrow key to decrease the desired value This alarm should typically...

Page 39: ...ess the Down Arrow key to advance to the next menu Odorant Inlet Pressure Monitoring For the fill valve to function correctly a pressure dif ferential between the Bulk Odorant Storage Tank and the Exp...

Page 40: ...e to occur between the initial issu ance of an alarm and the actual automatic call out function via a modem or Modbus communication port 1 0 No Alarm Call Out Delay 2 1 240 Number of Minutes Delay 3 2...

Page 41: ...se the Up Arrow or Down Arrow key to increment the value to the required framing mode of your Modbus system Available options are RTU or ASCII The final time you press the Enter Select key the comm po...

Page 42: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 32 NJEX EUR ver 08 2021 Section5 ProgrammingforProportional to FlowOperation Notes...

Page 43: ...entry will begin to flash when chosen Use the Up Arrow key to in crease the value and the Down Arrow key to de crease the value When a new value has been cho sen press the Enter key to store the new...

Page 44: ...and release the Select key The value entry will begin to flash when selected Use the Up Arrow key to in crease the value and the Down Arrow key to decrease the value When a new value has been chosen p...

Page 45: ...the alarm level points figure 66 press and re lease the Select key The Low Pressure value will be gin to flash when chosen Use the Up Arrow key to in crease the value and the Down Arrow key to decreas...

Page 46: ...w key to advance to the next menu Alarm to Relay Delay Is a programmable time that can be entered to allow for a period of time to occur between the initial issu ance of an alarm and the actual remote...

Page 47: ...47 may be pro gramed If 0 is programed this function will be disabled figure 71 Note the Modbus address is also used as the Sentry4 I D MODBUS Parameters There are 4 items of information that may be e...

Page 48: ...mmunications and Communica tions Port 2 will be available for communications using Sentry Software Communications Protocol COMM 1 2 Communications Port 1 and Commu nications Port 2 will be available f...

Page 49: ...urrent inputs i e 1 5VDC or 4 20mA figure 77 Choose Lin for input signals that are linear with respect to flow i e flow computers RTU s etc figure 78 OR Choose NonLin for input signals that are non li...

Page 50: ...o 5 00 VDC 20 mA at the flow input terminal board TB1 terminals 2 and 3 refer to the Wiring Control Document on page 117 in Appendix D Documents To calibrate the span set point apply 5 00 VDC 20 mA to...

Page 51: ...d calibration is the zero reference which can be set in this display figure 92 Zero Adjustment is used to calibrate the N 300G con troller to a zero pressure reference point The transmit ter is factor...

Page 52: ...emove it by venting the expansion tank pressure via V5 Open V3 In the display screen tell the verometer to fill This should bring the transmitter pressure to zero Choose Odor in the Calibrate Pressure...

Page 53: ...Figure 103 To calibrate the zero set point The output from the transmitter should be 1 00 VDC 1 Press release the Read key and the actual voltage present from the transmitter will be shown flashing i...

Page 54: ...1 100 pulses per minute choose PPM figure 110 Span Adjustment is used to calibrate the N 300G controller for 100 of metered flow at maximum input frequency i e 100 pulses per second at maximum gas fl...

Page 55: ...F Hr Since pulses per hour is not an option for programming the N 300G divide by 60 minutes per hour to obtain pulses per minute 100 000 pulses x 1Hr 1 666 7 pulses min Hr 60 min Since a maximum of 10...

Page 56: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 46 NJEX EUR ver 08 2021 Section 7 Calibrating Signal Inputs Notes...

Page 57: ...System turns into an UPPER CASE character set For example pmp pump becomes PMP indicating that an alarm is active figure 114 To indicate the specific activity of the alarm the N 300 will flash a descr...

Page 58: ...ump Alarms There are three conditions that will result in a pump alarm indication Over Pumping figure 123 the calculated pump displacement exceeds the set pump displacement by 30 Under Pumping figure...

Page 59: ...eter when the meter level reaches 0 figure 126 To manually fill the Verometer figure 127 press the Fill key and follow the instructions The following rep resent There conditions that will result in a...

Page 60: ...en be low the low flow shut off set point refer to Section 5 Programming for Proportional to Flow page 26 Over Flow figure 136 the flow input has exceeded 110 of the maximum gas flow but is still less...

Page 61: ...the odorant supply level in the bulk odorant storage tank Note The tank level indication is active only when there is a YZ supplied tank Tank Level Alarm Low Level figure 140 the odorant supply tank l...

Page 62: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 52 NJEX EUR ver 08 2021 Section 8 Working with the N 300 System Displays Notes...

Page 63: ...own Arrow or Up Arrow keys to change the setting Press the Enter key to load the entry into memory The display will stop flash ing when the entered value is loaded into the memory Press the Down Arrow...

Page 64: ...new value into memory The entered value will stop flash ing when it has been loaded into memory Press the Down Arrow key to advance to the next parameter Note this alarm window option will only displa...

Page 65: ...153 Choose Par parameters in the Set Selection menu figure 154 Choose Flow or Time in the Set Parameters menu figure 155 Choose Alarm from the Proportional to Time or Flow menus figure 156 Choose Tes...

Page 66: ...of Verom eter alarm to simulate This will be shown by the solid block appearing next to Odor Inlet Cabl Odor Inlet Lo Odor Inlet Hi XTank Cable XTank Low XTank High Flvalve Fail Leakage Slow Fill No...

Page 67: ...ulate This will be shown by the solid block appear ing next to Over Flow 125 or Loss of Signal text at the top of the N 300G display and the SIG indica tor will now be displayed in UPPER CASE letters...

Page 68: ...e Enter key to store the new Month into memory The entered value will stop flash ing when it has been loaded into memory then the numerical Day of the month value will begin to flash Use the Up Arrow...

Page 69: ...er 08 2021 Section 9 Setting Testing Alarms Arrow key to increase the value and the Down Arrow key to decrease the value When a new Minute value has been chosen press the Enter key to store the new se...

Page 70: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 60 NJEX EUR ver 08 2021 Section 9 Setting Testing Alarms Notes...

Page 71: ...lter fill valve Verometer pump odorant discharge manifold NJEX gas supply filter solenoid manifold pneumatic relay manifold and the expansion tank Individual compo nents of the system are shown below...

Page 72: ...become dirty a bulk odorant filter repair kit is available Fill Valve The purpose of the fill valve is to control odorant flow into the Verometer figure 173 The fill valve is opened when a pneumatic s...

Page 73: ...e level monitoring device Odorant enters the Verometer from the fill valve Odorant exits the Verometer by passing through a second filter element on its way to the pump The filter element is held in p...

Page 74: ...pe into the atmo sphere Each time the plunger returns it completely removes itself from the plunger seal This allows any air trapped in the hydraulic system to be vented The pump incorporates a cartri...

Page 75: ...to Section 12 System Maintenance page 80 Figure 200 An integral wafer check valve is built into the odorant discharge manifold The wafer is located on top of the plug that is inserted in the bottom of...

Page 76: ...ormally closed but is opened to charge the expansion tank with gas as required during system start up or purge process Additionally valve V5 is normally closed but is opened to vent the gas from the e...

Page 77: ...egulator for the bulk stor age tank 6 Check entire system for gas leaks and verify that the set pressures remain constant Low Pressure Relief Adjustment Section 11 System Operation The overflow protec...

Page 78: ...the Record form located in the Appendix C Response Forms on page 114 IMPORTANT If the serial number model type or the verometer tag number does not match the corresponding numbers featured on the N 30...

Page 79: ...The meter level display will indicate the Verom eter level as the verometer refills to 100 Next choose the mode of operation in the Proportional to Flow or Time display for either the Flow or Time ent...

Page 80: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 70 NJEX EUR ver 08 2021 Section 11 System Operation Notes...

Page 81: ...be considered when establishing a preventative maintenance schedule Recommended Maintenance Schedule Weekly Inspection 1 Verify gas pressures 2 Check for gas and odorant leaks 3 Examine the oil level...

Page 82: ...between the dart and the o ring when in contact with each other This contact is what causes the seal when necessary 4 Inspect the cap to body o ring item D and lubri cate or replace as necessary 5 Ins...

Page 83: ...ief in the cap assembly for the purpose of maintain ing the maximum expansion tank pressure at 25 psi 1 72 Bar To test and adjust follow these steps 1 With valve V6 open figure 196 slowly open valve V...

Page 84: ...4 4 Bar Close V4 5 Open V2 until meter level reads empty and bub bling is heard in the bulk storage tank Close V2 6 From the meter level screen choose fill and and then fill Verometer YES until bubbli...

Page 85: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 75 NJEX EUR ver 08 2021 Section 12 System Maintenance Figure 197...

Page 86: ...sure Gas Figure 198 Refer to the Venting Pressure Gas Operational Sche matic figure 198 on page 77 CAUTION Vented Gas will have STRONG odorant smell 1 Connect a Flare Odorant Filter Scrubber to Expans...

Page 87: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 77 NJEX EUR ver 08 2021 Section 12 System Maintenance Figure 198...

Page 88: ...until the expansion tank gauge reads 25 psi 1 72 Bar Close V4 3 Open odorant supply valve V17 and V6 on expan sion tank 4 Scroll down to the meter level screen on the controller and select Fill and F...

Page 89: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 79 NJEX EUR ver 08 2021 Section 12 System Maintenance Figure 199...

Page 90: ...g Starting the NJEX System Refer to the Priming and Starting the NJEX System Operational Schematic figure 200 on page 81 1 Scroll down to the meter level screen 2 Open V3 3 Manually stroke the pump wi...

Page 91: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 81 NJEX EUR ver 08 2021 Section 12 System Maintenance Figure 200...

Page 92: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 82 NJEX EUR ver 08 2021 Section 12 System Maintenance Notes...

Page 93: ...work will be per formed prior to removing components or fittings Inspect all tube fittings and valve packings semi annually to ensure that liquid odorant remains within the system Step by Step Resolut...

Page 94: ...tc for any unexpected values If another value is found to be abnormal inspect the bulkhead connector to interconnect cable connec tions for the presence of moisture or corrosion If moisture or corrosi...

Page 95: ...ll automatically resume when the flow signal returns to a level above the set point to stop odorization Signal Alarm Non Alarm Troubleshooting Steps 1 The Loss of Flow alarm will only be active with a...

Page 96: ...y could be set incorrectly Recalculate the span frequency and inspect the setting in the Claibration section of the N 300 Control ler The other cause could be the result of electrical noise interferan...

Page 97: ...les for any external damage such as cuts or crimps in the external cable sleeve or moisture inside the cable connector 2 Loosen and inspect the cable orientation pins for correct positioning All cable...

Page 98: ...electrical signal is not present when a fill is requested check all cables for corrosion mois ture or damage and replace if any signs of the previous mentioned problems are present and perform the te...

Page 99: ...t present when the tube is disconnected and the Verometer level continues to increase repair or replace the fill valve If the actuation gas is pres ent in the tube when disconnected the Verometer leve...

Page 100: ...page 25 or page 33 depending on the mode of operation 3 Observe if the alarm is still active if it is contact YZ Technical Services Verometer Expansion Tank Cable Alarm Troubleshooting Steps When an...

Page 101: ...he level in the Verometer does not increase then otherwise proceed to the next step below 3 Initiate a Verometer fill and record the time required to fill to 100 and note the level If the Verometer fi...

Page 102: ...pres sures less than 17 24 Bar a back pressure regulating device must be installed immedi ately outside the NJEX enclosure on the odor ant line leading to the pipeline injection point A back pressure...

Page 103: ...that the pump volume spacer matches the pump displacement parameter in the controller 3 Verify that all valves and check valves are proper ly set system operation Inspect for valve settings that can...

Page 104: ...ring or a stuck sticking plunger assembly Replace the spring if broken clean and relubricate the plunger assembly and actuation cylinder Make certain the seals are not sticking to the plunger as sembl...

Page 105: ...ania USA 18974 P 281 362 6500 www yzsystems com Page 95 NJEX EUR ver 08 2021 Appendix A Illustrations Odorant Actuation Gas Hydrualic Oil Actuation Gas Replacement Pump Seal Kit PN D3 0131 Appendix A...

Page 106: ...low B0 0104 60 Black B0 0062 50 Purple B0 0102 40 Silver B0 0101 30 Blue B0 0100 20 Gold B0 0063 Cartridge Nut PN B0 0083 Plunger Seal PN A6 0018 Plunger Guide Bushing PN B0 0084 Cartridge Body PN B0...

Page 107: ...08 2021 Appendix A Illustrations Pump Housing PN B0 0069 O Ring PN A5 2115 O Ring PN A5 1121 Cap PN B0 0072 O Ring PN A5 2023 O Ring PN A5 1027 Diaphragm PN A6 0087 Piston PN B0 0071 Spring PN C3 0002...

Page 108: ...ed View Figure 204 Discharge Check Cartridge PN B0 00756 Check Wafer PN B0 0074 Sleeve PN B0 0076 Check Wafer PN B0 0074 Seal Nut PN B0 0074 O Ring PN A5 1014 Pump Housing PN B0 0069 Check Wafer PN B0...

Page 109: ...s Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 99 NJEX EUR ver 08 2021 Appendix A Illustrations 7300 Verometer with Filter As sembly Exploded View F...

Page 110: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 100 NJEX EUR ver 08 2021 Appendix A Illustrations NJEX Model 6300 Pump Assembled Figure 206...

Page 111: ...Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 101 NJEX EUR ver 08 2021 Appendix A Illustrations NJEX Model 6300 Pump Actuation Assembly Exploded View...

Page 112: ...ilton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 102 NJEX EUR ver 08 2021 Appendix A Illustrations NJEX Model 6300 Pump Check Valve Assembly Exploded Vie...

Page 113: ...n Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 103 NJEX EUR ver 08 2021 Appendix A Illustrations 6300 Verometer with Filter Assembly Exploded View Figure 2...

Page 114: ...lts 4 each PN C0 0215 Upper Housing PN A3 0205 O Ring1 PN A5 1027 O Ring PN A5 1030 Dart PN A3 0206 O Ring1 PN A5 1012 Spring PN C3 0048 O Ring1 PN A5 1021 Tubbing Fitting PN A1 0012 Diaphragm1 PN A6...

Page 115: ...ystems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 105 NJEX EUR ver 08 2021 Appendix A Illustrations Bulk Odorant Filter Figure 211 O Ring P N A5 1...

Page 116: ...r Figure 212 Gas Filter Label PN D5 0074 O Ring 334 Viton PN A5 1334 Coalescing Filter Element1 PN C4 0133 Filter Retainer Washer PN C4 0102 Filter Bowl PN C4 0131 In Out Gas Filter Cap PN C4 0130 Fil...

Page 117: ...YZ Systems Milton Roy 201 Ivyland Road Ivyland Pennsylvania USA 18974 P 281 362 6500 www yzsystems com Page 107 NJEX EUR ver 08 2021 Appendix A Illustrations Electronics Assembly Figure 213...

Page 118: ...r query Function 5 allows writing single or multiple coils per query Control Functions The control functions available via Modbus are listed below The registers are accessed using Modbus func tions 1...

Page 119: ...ticular register was made by the master device Once a read is made the status will reflect the current state Address Access Description 00101 Read Only System Stopped 0 Running 1 00102 Read Only Verom...

Page 120: ...d Only Over Pump Alarm 1 01004 Read Only Under Pump Alarm 1 01005 Read Only Verometer Cable Alarm 1 01006 Read Only Verometer Slow Fill Alarm 1 01007 Read Only Verometer No Fill Alarm 1 01008 Read Onl...

Page 121: ...Date Day of Month Month 1 31 1 12 BCD 40006 Read Only HOU LOU Start Date Century Year 0000 9999 BCD 40007 Read Only HOU LOU Start Time Seconds Minutes 00 59 00 59 BCD 40008 Read Only HOU LOU Start Ti...

Page 122: ...he result data functions available via Modbus are listed below The registers are accessed using Modbus functions 3 6 and 16 Note The system must be stopped in order for any parameter changes to be acc...

Page 123: ...XX MMCF hr 6300GM XX XXX 7300 8300GM XXX XX m3 sec 6300LE XXXX X 7300 8300LE XXXXX gal min 6300LM XXXX X 7300 8300LM XXXXX liter min Address 40113 6300 X XXXX 7300 X XXX 8300 X XX English lbs pulse Me...

Page 124: ...ank _ ________________________________ 2 07 2 41 Bar bulk tank pressure range is required Supply Actuation Pressure ____________________ 5 17 Bar supply actuation pressure is required Pump Actuation P...

Page 125: ...blem mm yr battery VDC PARAMETERS Injection Rate Pump Displacement Proportional To Time Proportional To Flow Odorant Density Analog Max Gas Flow Linear Low Flow Shutoff Non linear Flow no signal Pulse...

Page 126: ...ate OverFlow 110 pmp bat vmtr sig tnk Verometer Alarm Simulate Low Flo Shtoff pmp bat vmtr sig tnk Verometer Alarm Simulate No Flow pmp bat vmtr sig tnk Verometer Alarm Simulate Loss of Signal pmp bat...

Page 127: ...0 1 I v y l a n d R o a d I v y l a n d P e n n s y l v a n i a U S A 1 8 9 7 4 P 2 8 1 3 6 2 6 5 0 0 w w w y z s y s t e m s c o m Page 117 NJEX EUR ver 08 2021 Appendix D Documents Wiring Control D...

Page 128: ...T 800 344 5399 P 281 362 6500 F 281 362 6513 Sales yzhq com www yzsystems com MILTON ROY LLC 201 Ivyland Road Ivyland PA 18974 USA MILTON ROY EUROPE SAS 10 Grand Rue 27360 Pont Saint Pierre France...

Reviews: