Section 2: System Installation
RAIL SKID SYSTEMS
TANK
CABINET
BL
BW
L
W
WEIGHT
Liters
mm
mm
mm
mm
kg
230
Simple
1320.8 1320.8 1371.6 1371.6
TBA
Skid System Mounting
Figure 12
1. Prepare a concrete slab that exceeds the
NJEX skid length and width dimensions by
at least 304.8mm.
2. When moving the system into place follow
these lifting guidelines:
a. Lift containment skid systems using
all four eyebolts on the corners of
the skid.
b. Lift rail skid systems from the bottom
of the skid by forklift or other sup-
portive device.
c. Do not move a system with liquid in
the odorant tank.
d. Do not lift a system by the tank lugs,
these lugs are designed only for the
weight of the empty tank.
3. Bolt the system to the concrete slab using
the 19.5mm mounting holes provided in the
skid. Recommended mounting bolt/stud
sizes are either 17.46mm or 15.88mm.
4. Connect a ground wire from one of the
grounding lugs located on the skid to a prop-
erly installed ground rod located adjacent
to the skid. *(Resistance to ground must be
less than 1 ohm).
CAUTION:
• Do not life the system by the TANK LUGS. These
lugs are designed only for the weight of the empty
tank.
• Do not move a system with liquid in the odorant
tank. The tank must be emptied first.
Figure 12
L + 304.8mm
W + 304.8mm
19.05mm
Summary of Contents for NJEX 6300G
Page 1: ...NJEX 6300G 7300G N A T U R A L G A S O D O R I Z A T I O N S Y S T E M...
Page 2: ......
Page 3: ...NJEX 6300G 7300G Instruction Operating Manual Version 08 2021...
Page 4: ......
Page 10: ......