YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
Page 15
NJEX EUR ver. 08-2021
Section 2: System Installation
Figure 13
Skid System Connections
Required field connections to place the NJEX into
operation are as follows:
1. Connect your I.S. Power Supply to the yellow
cable connection coming from the bottom of the
N-300 controller, and exiting the rear of your sys-
tem enclosure,
refer to the Wiring Control Docu-
ment on page 117 in Appendix D.
2. Connect the flow signal device to the termination
block located in the system control enclosure,
figure 6
,
refer to the Wiring Control Document on
2a. If used, connect the optional Inhibit Input signal to
the termination block located in the system control
enclosure,
figure 6
,
Document on page 117 in Appendix D
.
2b. If used, connect the RS-485 communication wir-
ing as required to the termination block located in
the system control enclosure,
figure 6
,
Summary of Contents for NJEX 6300G
Page 1: ...NJEX 6300G 7300G N A T U R A L G A S O D O R I Z A T I O N S Y S T E M...
Page 2: ......
Page 3: ...NJEX 6300G 7300G Instruction Operating Manual Version 08 2021...
Page 4: ......
Page 10: ......