YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
Page 78
NJEX EUR ver. 08-2021
Section 12: System Maintenance
Filling the Verometer
Figure 199
Refer to the Filling the Verometer Operational Sche
1. Close
V2
,
V3
, and
V5
2. Open
V4
until the expansion tank gauge reads 25
psi (1.72 Bar). Close
V4
.
3. Open odorant supply valve
V17 and V6
on expan-
sion tank
4. Scroll down to the meter level screen on the
controller and select Fill and Fill Verometer YES
(meter level should stop at just above 0) on NJEX.
Close
V9
completely then open 1.5 turns. On
8300 just move on to step 5
5. Select Fill and Fill Verometer YES on controller
(adjust V9 to fill in 3-4% increments) level should
stop at about 100%
6. Proceed to the Prime Start procedure on page 80
Summary of Contents for NJEX 6300G
Page 1: ...NJEX 6300G 7300G N A T U R A L G A S O D O R I Z A T I O N S Y S T E M...
Page 2: ......
Page 3: ...NJEX 6300G 7300G Instruction Operating Manual Version 08 2021...
Page 4: ......
Page 10: ......