Section 12: System Maintenance
Priming & Starting the NJEX
System
Refer to the Priming and Starting the NJEX System
Operational Schematic figure 200, on page 81.
1. Scroll down to the meter level screen
2. Open
V3
3. Manually stroke the pump with test switch until
Verometer level starts to drop (3-4%)
4. Close
V3
5. On the controller go up arrow to the Main Screen
(Start, Display, Set). Select Start then Start Pump
Yes