YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
Page 18
NJEX 7300G ver.08-2018
Section 3: Filling the Bulk Odorant Tank
Refilling the Bulk Odorant Tank
CAUTION:
Odorant has a very strong odor, which if allowed to
escape to the atmosphere, may cause problems in
the local community. Take necessary precautions
when filling an odorant storage tank to assure that
the local community is not disrupted during the filling
process. Verify that the entire system has no pres-
sure in it before beginning. Additionally all personnel
should wear protective clothing, and use equipment as
recommended by the chemical manufacturer during
this time. If you are uncertain about any aspect of the
odorant itself, you should contact the manufacturer of
your chemical prior to proceeding.
1. Place the N-300G controller in the Standby Mode
by pressing the
Standby
key.
2. Verify correct position of valves before beginning,
figure 22.
Open:
V12
Closed:
V10
,
V11
,
V13
,
V15
3. Connect a line from
V11
to a flare or vapor recov-
ery device, and open
V11
.
4. Attach odorant supply to
V10
, open
V10
, and
begin transferring odorant to the bulk tank.
CAUTION:
Fill tank to a maximum level of 80% of the tank capacity.
5. Close
V10
and
V11
, and remove odorant trans-
fer equipment, and line to flare or vapor recovery
device.
6. Open
V13
and
V15
.
7. Place the N-300G controller in the Run Mode by
pressing the
Standby
key.
Figure 22
Electronic Level Indicator
Odorant Vapor Return
1/2” NPT
Odorant Fill
1/2” NPT
V15 V13
V12
V11
V10
Summary of Contents for NJEX 7300G
Page 1: ...NJEX 7300G N A T U R A L G A S O D O R I Z A T I O N S Y S T E M ...
Page 2: ......
Page 3: ...The NJEX 7300G Instruction Operating Manual Version 08 2018 ...
Page 4: ......
Page 10: ......