YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
Page 80
NJEX 7300G ver.08-2018
Section 12: System Maintenance
Priming & Starting the NJEX
System
Refer to the Priming and Starting the NJEX System
Operational Schematic figure 200, on page 81.
1. Scroll down to the meter level screen
2. Open
V3
3. Manually stroke the pump with test switch until
Verometer level starts to drop (3-4%)
4. Close
V3
5. On the controller go up arrow to the Main Screen
(Start, Display, Set). Select Start then Start Pump
Yes
Summary of Contents for NJEX 7300G
Page 1: ...NJEX 7300G N A T U R A L G A S O D O R I Z A T I O N S Y S T E M ...
Page 2: ......
Page 3: ...The NJEX 7300G Instruction Operating Manual Version 08 2018 ...
Page 4: ......
Page 10: ......