YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
Page 6
NJEX 610G / 610F ver.11-2023
Section 2: System Installation
Standard System Mounting
1.
Securely attach a section of 2″ pipe in a vertical configuration at the location where the NJEX LVO
610G / NJEX LVO 610F is to be installed. Using the mounting clamps provided with the NJEX
LVO 610G / NJEX LVO 610F system, attach the system to the pipe.
2.
Connect a ground wire from the 2″ pipe to a properly installed ground rod. All wiring and bonding
must adhere to local laws and regulations for the location of the installation.
Figure 4