7
ENG
Z9 U3
(5) 3.5” HDD Installation
HDD
+''$QWL
vibration rubber
Bolt D
Bolt E
When transporting an assembled
system, please secure the HDD with
Bolt E as shown above.
(6) Cable Connection
When removing HDD, pull the fastening
lever outwards and then remove it.
Mother Board
Power Button
Fan Connection
PSU Power
Mother Board
(3-Pin Fan Connector)
Power LED
or
or